Loading...
SS9901-CS050318From: March 18, 2005 02/17/2005 21:37 P.O01/O01 SS4Oo/ l ]Od] Gri.~$om Lane Dell~s, Texas 75229 972~84~344 tale 972.484~223 fax Mr. Kenneth M. Griffin, P.E. City of Coppell 255 Parkway Boulevards Coppell, Texas 75019 Deforest & Sandy Lake Lift Station Coppell, Texas Subject: Excavation Shoring Dear Mr. Griffin, Can-Far Construotion Company has pulled of this jobsite. Can-Far Construction Company shoring system had a failure on March 1 ?, 2005 and we consulted our design engineer and he has advlca ua to halt all shoring working until Mastec has completed there work in this area. He staled that weight of Masteo's equipment is putting a surge load on the excavation and the shoring system was not design for this extra load. Also our shoring engineer believes that Mastec's equipment is causing vibration that is affecting the shoring. Can-Far Construction Company informed you in our letter dated March 1, 2005 that this situation was never discussed during the blddthg process and there this is the reason that our shoring system has no provisions for this situation. In addition to the existing*shoring problem our production has been negatively affect, by limiting our access to the excavati°n from only one side. Can-Far Construction Company requests a meeting to resolve these issues. Sincerely, Todd C Heft Project Manager CC Rick O'Dell, Charile Fen'ara, John Cantu, Tommy Bower h tMtng a soliar foun atton for a frrig ter f ture.