MA FY 00/01-CS010401REINFORCED CONCRETE PAVEMENT REPAIRS
Bid # Q 0101-02
9. A comprehensive traffic control plan is to be submitted for all job sites that is consistent with
the TMUTCD for Engineering review. Implementation of the traffic control plan and all
traffic control devices necessary for a safe work environment shall be provided at the sole
expense of the contractor. No streets will be allowed for full closure without a thorough
reviexv by the City of Coppell.
10. A 24-month maintenance bond at 50% of total value, on a form provided by the City, will be
provided by the successful bidder.
11. Reference the City Df Coppell Standard Construction Details and Subdivision Ordinance fo~
further clarification. . r x . .
12. All irrigation systems damaged will be re,paired to as good o'l: bett~r and to the sl~tisfaction of
the property owner. It is the contractors responsibility to obtain utility locations. Any
damage to existing utilities will be the sole responsibility of the contractor. Contractor will
be responsible for backfilling behind the curb, where curb has been removed and replaced,
and sodding the disturbed area with like turf. ,
I3. It will be the responsibility of the ~actor to-' proviiite written notification to affected
residents in the vicinity of the repairVai~-brior to the beginning of work. Information to be
included will be beginning and end dates of project, road closure iifformation- either total
partial and contact nu~mber(s). 4~ ~D~r--- ,, .i.~d~.I_ _.,..I..,~L_~
I4. All items necessary to complete the work including but not lirn~ited to paYement
traffic control plan, repair of irrigation systems, sodding, etc. are subsidiary to the price bid.
15. All the work contained in this contract lies within the city limits of the City of Coppell. Texas
and shall be constructed according to the City of Coppell approved construction standards
and specifications and the Standard Specifications for Public Works Construction, Third
Addition and any amendments as adopted by the North Central Texas Council of
Governments.
16. LABOR CLASSIFICATION AND MINIMUM WAGE SCALE
The City of Coppell is the contracting agency for this construction project. The following
statute requires any contracting agency to specify the generally prevailing rate of wages in
contracts that are bid.
Vernon's Texas Civil Statutes - Article 5159a:
"Construction of Public Works in State
and Municipal or Political Subdivisions;
Prevailing Wage Rate to be maintained."
Pursuant to the requirements of this statute, the City of Coppell, has ascertained the following
rates of wages are paid to various classifications of workers in the locality of this project.
CITY OF COPPELL ,, PURCHASING DEPARTMENT ,, 255 PARKWAY BOULEVARD * COPPELL,TEXAS 750~9
REINFORCED CONCRETE PAVEMENT REPAIRS
Bid # Q 0101-02
Not less than the following hourly rates shall be paid for the various classifications of work
required by this project. Workers in classifications where rates are not identified shall be
paid not less than the general prevailing rate of "laborer" for the various classifications of
work therein listed.
The hourly rate for legal holiday and overtime work shall be not less than one and one-half (1
& 1/2) times the base hourly rate.
The rates specified are journeyman rates. Apprentices may be used on the project and may
be compensated at a rate determined mutually by the worker and employer, commensurate
with the experience and skill of the worker but not at a rate not less than 60% of the
journeyman's wage as shown. At no time shali a journeyman supervise more than one (1)
apprentice. All apprentices shall be under the direct supervision of a journeyman working as
a crew.