Loading...
ST9302-CS 981103 (2)Kimley-Horn and Associates, Inc. November 3, 1998 Mr. Jun Battad, EIT, MBA City of Dallas Water Utilities Department 320 E. Jefferson, Room 218 Dallas, TX '/5203 · Suite 1100 801 Cherry Street Fort Worth, Texas 761O2-6803 Re: Coppell Sand Lake Road DW 30" WL Relocation KHA No. 06940601 Dear Jun: We must schedule a time in the next six months to re-evaluate the construction sequence of events associated with relocating portions of the line. Much time has passed since our last meeting with the affected parties. The Contractor plans to begin work in September 1999 and finish about September 2000. This provides ample opportunity for sufficient changes in operating conditions to require a modification to construction sequencing. Also of paramount concern is Flower Mound's water demand. They cannot do without Dallas water during the summer and with recent growth we must re-evaluate their ability to meet off-season demands without Dallas' supply. If the water line relocation can be accomplished during a time when Flower Mound does not require Dallas water, then the original proposed sequence of construction can proceed. If not, then we must develop an alternative method. Ken Griffin has indicated that dedicating the new Coppell 30' water line for use by DWU during this time may be a feasible option. I will be contacting the City of Flower Mound and the Upper Trinity Regional Water District to arrange a meeting with us during the first quarter of 1999. Please let me know of any others that should be invited and of any key issues that we must consider. Yours truly, KIMLEY-HORN AND ASSOCIATES, INC. Lee K. Allison, P.E. LKA:pts Copy to: ~'~Ken Griffin Ed Bell Construction · P:\93021.00\9~Y21LTR~o..na[.doo TEL 817 335 6511 MET 817 654 4266 FAX 817 335 5070