Loading...
Four Seasons 2R-CS050512COPPELL MEMORANDUM TO: Larry Davis, Engineering FROM: DATE: REF: Danny Hightower, Public Works May 12, 2005 Four Seasons, Lot 2R 1. Paint vault lids blue 2. 3" drainage around vaults 3. Vault lids need handle 4. Vaults need brass plugs in ball valves, each vault (4 large, 4 small) 5. All DC's to be tested - vaults and domestic and irrigation 6. Mark all FH on curb in red and valve lids red 'i. '--Mark BOV on curb at blow off Valve in blue 8. Replace blow offbolt on cap and paint blue 9. Paint valve lids blue on 24" water line and meter can. I0. Seal around pipes in vaults to stop leaking 11. Need brass plugs on domestic DC 12. Need brass plugs on irrigation DC 13. Irrigation test on DC 14. Recheck WAD holding at this time City to clean stub out 15. Paint manhole lid red and mark on curb WAD in red 16, PI-' COPPELL MEMORANDUM TO: Larry Davis, Engineering FROM: Larry Morton, Streets DATE: May 12, 2005 REF: Four Seasons, Lot 2R walkthru [. Remove zip strip and clean and seal driveway offRoyal. 2.Drainage - ok }','1- g, ~,~