Loading...
Ballet TX-LR050513CLIENT: SAM ENGINEERING & TESTING, L.P. Serving The Goo-Industry Since 1974 .~ 1115 Luke Street, Suite 100 Irving, Texas 75061  ~(9~2) 790-1910 · FAX: (972) 790-0967 E DENSITY OF SOIL REPORT DATE: 5/13/05 ,E03'~'[.BJ, Suite 700 Dallas, TX 75234 TEST METHOD:ASTMD-2292 & 3017 TEST DATE: Geotechnical 5/10/0~ PROJECT: Proposed Ballet Academy of Texas 145 Fitness Court Coppell, TX *ASTM D698A - See Proctor Report for Details Minimum Required Compaction = 95% PROJECT #: 286TXIK5 REPORT #: 2 PAGE 1 OF t ATTN: Ken Head SE&T TECHNICIAN: Jude inac Pad - Southeast Pad - Center Pad - Non Pad - Southeast Pad Center Pad Northwest ast 1st 1 113 11 1 114 14 41-17 1119gll P 1st 1 112 13 1 114 14 11-17 //:t J P est 1st 1 110 12 1 114 14 11-17 P asr 2nd 1 109 12 I 114 14 11-17 ~H 9~ P est 2nd 1 112 13 1 114 141117 p All densities meet the minimum required values unless otherwise noted. project and we trust that this report is satisfactory Very Truly Yours, SAM Engineering & Testing, L.P. ~en a pleasure to serve you.,~on~l~s Sadik (SAM) AI-Musawe, M,Sc., Ph.D, P.E Civil & Environmental Engineer Texas Registration Number: 61893