Loading...
Villas at LV-CS050518COFFELL I)aniel I.. t lcischlnan, P.E. Dowdy. Anderson & Associates 5225 Village (7reek Drive, Suile 200 Pbno, 'IX 75093 RE: Villas al Lake Visla. Phase One REVISED Fee Assessment l,etter Ma3 18, 2005 Dear Mr. I tcischman: Enclosed is a revised cnpy of lbo Cit3 oriCoppcll Dcxctopmcnt Fcc Assessment table, along v,'ilh a copy of thc Development Fcc calculations tbr thc t'cl~rcnccd development. Pct- your request, water impact fees xt crc calculaled based on 93- ," meters tbr domcslic xxater I lowcxer, since 1" metcrs arc required for lire protection, the actual costs of lhe 93-I" meters arc assessed. Please lnakc payment fbr lhc Impact Fees lo thc City of Coppcll in tile amount of $199,020.00 and for;,,ard to the l(nginccring Dcparlmcnt along xxith a copy of the Fcc Assessment fable. This amount is a portion of the assessed l'ccs that need to bo paid prior to filing ortho final plat. Please note that tile Texas [ cgislature, trader Senate Bill 243, delayed thc collection uf Waler and Sewer hnpact Fees until lhc issuance of a Building Pet-mit. Please provideacopyofthc Engineer's estimale or contract to our ofllce so thc 2°b & 4t~;, construction inspection l~e can be verified. Thc construction inspcction fbes must bc paid prior to the scheduled prc-conslructinn meeting. '1 hc additional rices lbr v, atcr and soy, ct- taps. v. atcr meters, and utility inspection fecs need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered xxhcn those t~cs are paid. ,\ppropriatc paylnen{ nf thc l equired IL'es xxill help insure a successful beginning ori this project. We look Ibrxk ard to xk oflcing with >oki on this project. If you haxe an} questions, please contact nrc. Sincerely, ( ir aduate Engineer Jcnnil~q' Armstrong. Finance Director Mary Beth Splctzcr, Admin Secretary. Building Inspections Glenn }lollowcll. P.E.. Assis/anl Director of Public Works Grog ,Ioncs, Chief Building O[ficial Brad Reid, Director of Parks and Recreation DEVELOPMENT FEE I'ABI,E Project: I 'illas at Lake ! ~sta, Phase One Dale: 5/1 ~2oo5 TOTAl, AMOUNT DUE FEES DUE PRIOR 'FO COUNCIl. APPROVAL Water hnpact Fcc 537,24t).00 (t00% duc [it Issuance of Building Permit) Water Fap Inspection Fcc S4,900.00 (100% due at Issuance oJ' ~ alcr Mclcr) XX atcr Meter Fcc (Domestic) 55,840.08 (100% duc at Issuance of Water Meter) Water Mctcr Fee (Irrigation Firclinc) 5846.88 ( t00% duc at Issuance of Walcr Meter) Water Meter Deposit (Domestic) $2,820.00 ( 100% duc at Issuance of Water Mclcr) hTigation/Firdine Meter Deposit $120.00 (100% duc at Issuance of Water Meter) XVastcxx atcr Impact Fcc $28,280.00 (100% duc at Issuance of Building Pormit) I Was/ewater Tap Inspection Fcc 54,700.00 (100% due at Issuance of Building Pcrmil) t/tilily Final Inspection Fcc 54.700.00 (10(~% due at Issuance of Building Park Fee Sl 1%505.00 Sl 19,505.00 ( 100(~; due prior to ('ouncil Approval) Roadx~ ay hnpact Fcc 579,515.00 S79,515.00 (100% duc prior to Cotmcil Approval) Street Light Fcc Intbrmalion not Available (100% due prior 1o Acceptance of Project) Street Sign Fee [nlkmnation not Available (1oo% duc prior to Acceplancc of Pro. iect) ('onstl'uclio~ Inspection Fee Inlbrmation not Available (1(10% due prior to Slar/o f ('onslruction) F()FAL S288,466.96 I'OTAL AMOUNF DIE PRIOR TO FIIANG FINAL PleAT S199,020.00 DEVELOPMENT FEE WORKSHEET PROJECT: l'illas at LaAe I Zsta, Phase One DATE: 5/17/2005 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 93 - 5/8 inch X 3/4 inch = 93 1 - 2 inch - 8 4 2 inch = 32 0 = 0 -- 0 Total #: 133 ESU's @ $280 00 ea (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 98 Connections @ $5000 ea (Single family due prior to issuance of building permit) (All other developments due prior to issaance of meter) Domestic Water Meter Fee: Total #: 93 1' Domestic Meter(s) @ (***) $60.52 1 Additional Domestic Meter(s) @ $211.72 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total #: 4 h rigation Meter(s) @ $211 72 Total #: 0 Additional Irrigation Meter(s) ~) $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) l)omestic Water Meter Deposit Fee: Total #: 94 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) hTigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastcwater hnpact Fee: Total Domestic Meters ESU's: 101 (Due prior to issuance of building permit) $28000 ea. Wastewater Tap Inspection Fee: Total #: 94 Connections @ $5000 ea. (100% due prior to issuance of building permit) Ulility Final Inspection Fee (All dexelopments): Total #: 94 Lots @ S5000 ea (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's ESU's $37,240.00 $4,900.00 $5,628.36 $211.72 $846.88 $000 $000 $2,820.00 $120 00 $28,280.00 $4,700.00 $4,7o000 Page 1 DEVELOPMENTFEE WORKSHEET Park Fee (For Residential Developments Onl,v): ": Preliminar) plat approx ed: After October 20. 1993 Park Development Zone: 93 Single-family @ $1.28500 per Iht 0 Multi-family @ $1 28500 per unit (100°/o paid prior to Council approval of final plat) Zone 2 $119,50500 $000 $79,515.00 Information not Available Road~a3 hnpact Fee: (See attached fee calculations) Slreet l,i~ohtin~ Fees: Assessed for lighting in the City's right of-way This fee cannot be assessed until after·U Electric submits the lighting plan for the proposed development Once the plans are submitted, $29260 per light will be assessed. (100% due prior to final acceptance of developmenti Slreet Sil~n Fees: Assessed for signage in the City's right of way (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for' assessment The contracts should indicate the cost 1o construct the ~mprovements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available *** The use of 1" meters is required for fire protection, however, impact fees are being assessed for 3/4" domestic meters. Page 2 ROAD~AY IMPA('T FEE CAI~CUI~ATIONS PROJEC F: IL\ I'E: I 'illa,~ at Lake ! ista, l'hase tim' 5/1 ~005 I/()AD%VAY IMPACI' FEF2 , atcgol5 ** Residential )aud [st: "'~: I<csidcnlial ()thews Not Spcciiied No lots [ mis 93 Dexelopmcnt [ nits ** 93 00 Vehicle Miles pet I)cvclt)pmcnt t'nit ** 2.85 Icc pet Vehicle Mile *** $300 Roadx~a) hnpact Fee duc (DcxclopmcmUnits) x Vchiclc Miles per 1)ex elopmenl [ Illil} X {FCC pcl' VChiclc Nlllc> $79,515.(}0 4 (kigurc2 RoadxxayhnpactFccStudy) ~:* (1 able 3 Roadway Impact Fcc Stud3,) **:~ (Schcdtdc 2. Page 3 Roadv, ay Impact Fcc Stud)')