Loading...
Vista Ridge 1R-8 D-CS050518 (3)Page 1 of 1 Charlene LaMattlna - Re: The Plaza Infrastructure To: Date: Subject: CC: Charlene LaMattlna iVlarvilq, Kelth; Ro55, Casey 5/I 8/2005 $:04 AM Re: The Plaza Infrastructure lspean@aol.com; nealheckel@sbcgloba h net Casey- We wdl be happy to ~ssue an Early Grading Permit under the conditions that were discussed w~th ~,e~th prewously. We do not, however, break ouL the utd~ty portion of the work into that permit. At the time you are ready to apply for either an Early Grading Permit (grading only) or Construction Development Permit (grachng, utd~t~es, flatwork), please submit the appropriate permit apphcat~on, supporting documentation, plans to be stamped by th~s ofhce, and fees. After rewew of the permit apphcat~on package, we can schedule a pre-con. Charlene La Mattma Charlene La Mattma. C~ty of Coppell Graduate Dagmeer >>> "Casey Ross" <cross@daa-cw~l.com> 05/I 8/05 8:45 AM >>> Keith, The Plaza Infrastructure plans were resubmitted last Thursday. We have addressed the minor comments except getting a letter from TxDOT and Lewisville. We are in the process of getting to you both of those letters so we can schedule a grading preconstruction meeting. We have a utility permit from TxDOT for the water line and sanitary sewer line connections in their ROW, Can we also include the water and sanitary sewer construction with the grading precon? Thanks, Casey Ross file://C 5Documents%20and%20Settings\clamattina\Local%20Settings\Temp\GW} 00001 .... 5/19/2005