ST9302-CS 980915SENT BY:D.~IAS RE~ION ~ ; ~-15-~ ; 2:2~M ; TU ELECrRIC~ ff728681304;# 2/ 2
TU k-r_i~CTRiC
EAST DE~qlGN ENG~O ~ERVICE~q
SUMMARY OF COST ~'FfMA'IT~
PRF_,PAREDBY:BOBBYINMON
SEFI'EMBER g, 199g
INST,~I-! .ATI'ON OF -~"I'RFJ~ LIGHTS ON SANDY LAKE ROAD - PHASE IV
TU INST~t.t ~r~
DBSCRIFTION:
30' SQUARE S'l'~Tk~ PAINTED STANDARDS WITH ~0 WAXT HI~.
DOUBLE RF~ANOULARLUM1N~, 66 ~ $1,~50.00 EACH
CONCI~'I'E FOUNDATXON$ FOR STANDARD.q, 66 ~ $ 250.00
CONDUIT AND WIRE FROM STATION 0~+00- 1064.00
10,300frr. ~. $4.00/FT.
COST
$107.,300
$ 41,200
$160,000
IF THE cn'Y OF COPPBLI. PROVIDES ImOUNDATIONg, TRENCH, AND CONDI f{T TI4E ONLY
CO~'l' WOULD BE FOR THE 8TRB~.r LI(]HT ~rANDARI~ WITH DOtrnLB LUMIN~ A.~{
SHOWN ABOVI~: $102,300.