ST9703-BD050426 MacArthur Widening Project Q- 0405 -01 April 26, 2005 3:00 p.m. Bid Tabulation Company JRJ Paving Tiseo Paving Rebcon Alternate A $319,988.85 $321,672.00 $364,936.00 Calendar Days 75 60 90 Alternate B $329,988.85 $375,672.00 $360,936.00 Calendar Days 75 60 90 BID FOI~M PROJECT IDENTIFICATION: MacArthur Boulevard Widening Project # ST 97-03 in Coppell, Texas BID OF (~AME OF FIRM) DATE THIS BID IS SUBMITTED TO: City of Coppell (hereinafter called OWNER) c/o Purchasing Agent 255 Parkway Boulevard P.O. 9478 Coppell, Texas 75019 CITY OF COPPELL BID NO: Q- 0405-03 The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. BIDDER accepts all of the terms and conditions of the Advertisement or Notice to Bidders and Instructions to Bidders. This Bid will remain subject to acceptance for ninety (90) days after the day of Bid opening. BIDDER will sign and submit the A~eement with other documents required by the Bidding Requirements within fifteen (15) days after the date of O~,VNER's Notice of Award. 3. In submitting this Bid, BIDDER represents, as more fully set forth in the A~eement, that: (a) No: Date: Rec'd: BIDDER has examined copies of all the Bidding Documents and of the following Addenda (receipt of all which is hereby aclq~owledged): / - 15 BMdmg Doc z~ments (b) BDDER has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any mariner may affect cost, pro~ess, performance or furnishing of the Work. (c) (d) (e) (f) BIDDER has studied carefully ali reports and drawings of subsurface conditions contained in the contract documents and which have been used in preparation of the contract documents. CONTRACTOR may rely upon the accuracy of the technical data contained in such reports, but not upon nontechnical data, interpretations or opinions contained therein or for the completeness thereof for CONTRACTOR's purposes. Except as indicated in the inxmediately preceding sentence, CONTRACTOR shall have full responsibility with respect to subsurface conditions at site. BIDDER has studied carefully ail drawings of the physical conditions in or relating to existing surface or subsurface structures on the site, which are contained in the contract documents and which have been utilized in preparation of the contract documents. CONTRACTOR may rely upon the accuracy of the technical data contained in such drawings, but not for the completeness thereof for CONTRACTOR's purposes. Except as indicated in the immediately preceding sentence, CONTRACTOR shall have full responsibility with respect to physical conditions in or relating to such structures. BIDDER has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies (in addition to or to supplement those referred to in (c) above) which pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, perfmTnance or furnishing of the Work as BDDER considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, explorations, tests reports or similar infommtion or data are or will be rcquired by BIDDER for such purposes. BIDDER has reviewed and checked all infommtion and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports or similar information or data in respect of said UndemTound Facilities are or will be required by BIDDER in order to perlbm~ and fumish~the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. BIDDER has correlated the results of ail such observations, examinations, investigations, explorations, tests, repons and studies with the terms and conditions of thc Contract Documents. 1- ] 6 B~dding Doc' ument~ BDDER has given ENGLNEER wTitten notice of all conflicts, errors or discrepancies that it has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BDDER. (h) This bid is genuine and not made in the interest of or on behalf of any undisclosed person, finn or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. (i) It is understood and agreed that the following quantities of work to be done at unit prices are approximate only, and are intended principally to serve as a guide in evaluating bids. (J) It is understood and agreed that the quantities of work to be done at unit prices and materials to be furnished may be increased or diminished as may be considered necessary in the opinion of the OWNER to complete the work fully as planned and contemplated, and that all quantities of work, whether increased or decreased, are to be performed at the unit prices set forth, except as provided for in the Contract Documents. It is understood and agreed that all work under this contract will be completed within the bid calendar days. Completion date will be established in the Notice to Proceed. It is understood that time of completion will be a consideration in the award of the bid. City Council approved a resolution on March 8, 2005 to allow for the continuous closure of one lane of traffic in each direction along MacArthur Boulevard, from May 31, 2005 through August 12, 2005. This time period is the summer break of the Coppeil Independent School District and the Carrollton-Farmers Branch Independence School District. Allowable closings of the intersecting streets are detailed in Section 5 - Descriptions of Pay Items, Traffic Control Plan. Due to the time constraints and the inconvenience to the citizens, time of completion will be a strong consideration in awarding this project. It is strongly recommended that each bidder visit the site p~5or to submitting a bid. Construction constraints exist, including traffic, that could affect productivity. BIDDER will complete the Work for the following price(s): 1-] 7 Bidding Documents MacArthur Boulevard Widening Project # ST 97-03 Base Bid - Third Southbound Lane - Unit Price Bid Schedule Item Quantity Unit Description and Pricein Words Unit Total No. Price Price I-1 I LS Mobilization & Demobilization Complete in Place and I'4. Cents per Each. I-2 1884 LF Remove & Dispose of Concrete Curb ~x'4 Dollars per Linear Foot. I-3 1299 CY Excavation and Removal of Excess Material Complete in Place ~ Dollars and ~ Cents 131 '7...10, ~.~ per Cubic Yard. I-4 2 EA Relocation of Air Release Valves ,l:~mplete in Place · ~.~ ~,,~ Dollars and _ti., Cents )er Each. I 5 1 LS Extention of Irrigation Conduit at Median Openings Complete in Place ~o6.1~ Dollars and t,~ Cents oer Lump Sum. I-6 2579 SY Subgrade Preparation Complete in Place and ~, ~,,/ Cents per Square Yard. 1-18 Bidding Doczlrnents MacArthur Boulevard Widening Project # ST 97-03 Base Bid-Third Southbound Lane - Unit Price Bid Schedule Item Quantity Unit Description and Price in Words Unit Total No. Price Price I-7 2374 SY 8" Concrete Pavement with Monolithic Curb Complete in Place ~,~'~ ~4b Dollars 0"1 and '~..14¢.~a'~ Cents - per Square Yard. I-8 164 SY 6" Stamped Concrete for Median Noses CoNl~lete in Place 4',o.l, oa~ ,,.r Dollars and ,'qo Cents per Square Yard. 1-9 I LS Pavement Markings & Signage Complete in Place ~°~X~.,.o Dollars and' ~,, Cents per Lump Sum. I-10 I LS Restore Irrigation System ~r~,.~plete in Place · ,r~.a Dollars o. and t',A. Cents per Lump Sum. I-I 1 1 LS Final Shaping & Sodding of Median Comple? in Place -r~.a,, s ~,~ c, Dollars I~ " and t4.. Cents-- )(.900 ~'~,~OO per Lump Sum. I*12 1 LS Furnish, lnstall 8,: Maintain Traffic Control Devices Complete in Place ..,~, ,.~. ~o~.¢ 0.40 Dollars and 4% Cents per Lump Sum. I 19 B~ddtng Document3 MacArthur Boulevard Widening Project it ST 97-03 Base Bid-Third Southbound Lane - Unit Price Bid Schedule Item Quantity Unit Description and Price in Words Unit Total No. Price Price 1-13 1 LS Furnish, Install, Maintain, and Remove Erosion Control Devices C. orr)plete in Place ~'q~,~ z,.a ~, Dollars and /~[- Cents per Lump Sum. TOT,AL BID ITENIS BASE BID I-1 Thru 1-13 TANGIBLE PERSONAL PROPERTY COST 1-20 Biddzng Document3 MacArthur Boulevard Widening Project # ST 97-03 Alternate 'A' - Stamped Concrete - Unit Price Bid Schedule ltcm Quantity Unit Description and Price in Words Unit Total No. Price Price 1-14A 1 LS Brick Paver Replacement at Riverchase Drive - Stamped Concrete Comrflete in P. lace q o.,._ _'r~,-~*,,,,,, ¢ Dollars and M. Cents per Lump Sum. TOTAL BID ITEMS ALTERNATE 'A' 1-14A TANGIBLE PERSONAL PROPERTY COST Alternate 'B'- Stamped Asphalt Paving - Unit Price Bid Schedule Item Quantity Unit Description and Price in Words Unit Total No. Price Price I-14B 1 LS Brick Paver Replacement at Riverchase Drive - Stamped Asphalt Comr~lete in Place _a.~'~ ~.~..~,a Dollars and JM · Cents per Lump Sum. TOTAL BID ITEMS ALTERNATE 'B' 1-14B TAd~GIBLE PERSONAL PROPERTY COST 12/ BID SUMMARY TOTAL PRICE CALENDAR DAYS TOTAL BID ITEMS: BASE BID Plus ALTEP~NATE 'A' Stamped Concrete Pavement I-1 thru 1-13 Plus 1-14A BASE BID Plus ALTERNATE 'B' Stamped Asphalt Pavement I-I thru I~13 Plus 1-14B -/'5 1-22 B/ddlng Document.~ BIDDER agrees that ali Work awarded will be completed within ~ 5 Calendar Days. Contract time will commence to run as provided in the Contract Documents· Communications concerning this Bid shall be addressed to the address of BIDDER indicated on the applicable signature page. BIDDER understands that the Owner is exempt from State Limited Sales and Use Tax on tangible personal property to be incorporated into the project. Said taxes are not included in the Contract Price (see Instructions to Bidders). 10. The terms used in this Bid which are defined in the General Condilions of the Construction Contract included as part of the Contract Documents have the meanings assigned to them in the General Conditions. The City of Coppell resen'es the right to delete any portion of this project as it may deem necessary to stay within the City's available funds. Should the City elect to delete any portion, the contract quantmes ,al be adjusted accord ng y. SUBMITTED ON Signature: 1-23 gtddtng Document3 BID AFFIDAVIT The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and are submitted as correct and final. Bidder further certifies and agrees to furnish any an&~or all commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be ninety' (90) calendar days from the date of the bid opening. STATE OF ~ ~ 5 COUNTY OF ~).~.~Ci~'-I BEFORE ME, the undersigned authority, a Notary Public in and for the State of"P-t~,o~, , on this day personally appeared V~/~ i'Z-.t"'"k.{ ~ ~. p..~l.t~ xvho after being by me duly sworn, did depose and say: am a duly authorized office/agent for Name of Firm and have been duly authorized to execute the foregoing on behalf of the said ,'game of Fi,'m I hereby certi~, that the foregoing bid has not been prepared in collusion with any other Bidder or individual(s) engaged in the same line of business prior to the official opening of this bid. Further, I ceftin, that the Bidder is not now, nor has been for the past six (6) months, directly or indirectly concerned in any pool, agreement or combination thereof, to control the price of services/ commodities bid on, or to influence any individual(s) to bid or not to bid thereon." Name and Address ofBidder: '~\'-L."~ k0~xl~,46.~. L,'~, by: Signature: ~~/~'/ SUBSCRZBED AND SWQRN to before day of . LISA G^gL~ HARMON If BIDDER IS: An IndMdual (IndMdual's Name) (Seal) doing business as Business address Phone No. A Partnership (Firm Name) -- (General Partner) Business address _ ~..,-b"'l '"1 ~A/z¢,o~q_~.~.t..,,,~ ~Z.o. li:;~,.~.r.~,4 Phone No. (Seal) A Corporation BY (Corporation Name) (State of Incorporation) By (Name of person authorized to siam0 (Title) (Corporate Seal) Attest (Secretary) Business address Phone No. A Joint Venture By' g v (Name) (Address) (Name) (Address) (Each joint ventmre must s~gn. The mariner of signing for each individual, partnership and corporation that is a palmer to the joint venture should be in the maimer ~ndicated above) 1 25 Btdd ng Doc