Loading...
ST9703-AG050510AGENDA REQUEST FORM COFFELL DEPT: Engineering DATE: May 10, 2005 ITEM #: 25 ITEM CAPTION: Consider approval of awarding Bid/Contract ,9 Q-0405-03 to JRJ Paving, L.P., for the construction of the MacArthur Boulevard Widening Project, from Bethel School Rd. to Belt Line Rd., in an amount of $319,988.85, as provided for in CIP funds; and authorizing the City Manager to sign. GOAL(S): APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve M - Raines S - Brancheau Vote - 7-0 EXECUTIVE SUMMARY: This project consists of the construction of a third southbound lane from Bethel School Rd. to a point approximately 430 feet north of Belt Line Rd. The low bidder on the project was JRJ Paving, L.P. with a bid amount of $319,988.85. Staff recommends approval of the contract with JRJ Paving k.P. for the construction of the MacArthur Boulevard Widening project and will be available to answer any questions at thc Council meeting. FINANCIAL COMMENTS: Funds are available in the Street CIP accounts for this project. Agenda Request Form - Revised (}904 Document Name: #MacArthur COPPELL TO: FROM: DATE: REF: MEMORANDUM Mayor and City Council Keith Marvin, P.E., Civil Engineer May 10, 2005 Consider approval of awarding Bid/Contract # Q-0405~03 to JRJ Paving, L.P., for the construction of the MacArthur Boulevard Widening Project, from Bethel School Rd. to Belt Line Rd., in an amount of $319,988.85, as provided for in CIP funds; and authorizing the City Manager to sign. On April 26, 2005 the City of Coppell received and opened three bids for the construction of the MacArthur Boulevard Widening project. This project consists of the construction of a third southbound lane from Bethel School Road to a point approximately 430 feet north of Belt Line Road. This point corresponds to the recently completed Congestion Mitigation and Air Quality (CMAQ) project constructed by Dallas County in conjunction with TxDOT. See the attached exhibit for additional information on the location of the project. In 1997, City of Coppell staff began design work on a project to widen MacArthur Blvd. from Bethel School Rd. to Belt Line Rd. Once the CMAQ intersection improvements were completed by Dallas County, city staff finished the design of the widening and we are now ready to proceed with construction. In addition to the widening we have included the brick paver replacement at the intersection of Riverchase Drive and MacArthur Boulevard in this project. Since this intersection is in the middle of the widening project we did not want to have two different contractors trying to work in the same area. The low bidder on the project was JRJ Paving, L.P., of Denton, Texas, with a bid amount of $319,988.85. This bid was for 'Alternate A' which includes stamped concrete to replace the brick pavers as opposed to 'Alternate B' which was for stamped asphalt. The stamped concrete was a lower priced option under this bid, and there was no difference in the length of time bid for the two alternates. This contractor has not performed work within the City of Coppell in the recent past, however references were checked, and there was no indication that they would not be able to complete the job. The Engineering Department designed this project in-house, and our estimate of cost was $320,854 for the construction. The bids ranged from the low bid of $319,988.85 to a high bid of $364,936. Staff recommends award of the contract for the construction of the MacArthur Boulevard Widening project to JRJ Paving, L.P., in an amount of $319,988.85, with an estimated completion time of 75 calendar days. Staffwill be available to answer any questions at the Council 3 y Y'�� 'rte 4( fi ,, r � ' _ x-*� i EFFERSON AT RIVERCHA RIVERCHASE GOLF COURSE 1G q % i ,. * , • . - " , 4 1fi,,,'.1- ..: iir 1 /* N y , .r, • ♦ `f ' , „ BRICK PAVER - . � : ,a ,,'+ p r L REP LA CEMENT . r . Q ( '� � �..� i t` I t j .. R ��"" lam` t • 6 ?w*e a - � ; /� - . ' ,► VER ASE PL AZ A L , �eK 4� 1_ a 4ir f ,�. *� itr.1.4„'' i TQ�' II-* _t a , MocARTHUR PLAZA �. t ` 3 BEGIN PROJECT. CONSTRUCT ADDITIONAL '.-- a., - END PROJECT .: = . SOUTHBOUND THROUGH LANE .�, ,. ' !„� er a c v i �t LLII ' 3 " '41,.--',,4. ' � ADDITIONAL THROUGH AND LEFT TURN LANE " � `' I:9 -7� " -� g � ' , COMPLETED BY C.M.A. Q. PROJECT ST96 -02 m " ''' v ' SiSb ' 9 -7 y q, 1 �E r F O �'' COPPE SSINC - -.'"- ----- CRO W WI r O ,4, ''''C.4'' 4 . 1 ,, ,.... i 1 . . ,,..., ,,,,. , , ,,, _ ,,,,„,,,,,_ ,..., . , ,,, NORTHLAKE WOODLANDS EAST PH 10C _ ° :y _ .' •I AREA COMPLETED ST97 - 03 S. MACARTHUR BLVD. BY C.M.A.Q. PROJECT : : ; : ; : : ::d SOUTHBOUND THRU LANE ADDITION 0 125 250 AREA OF PROPOSED ' " ° CONSTRUCTION COPPELL 1 INCH = 250 FT. Greeted on 29 April 2005 ty Scdt lira S1CAMIn M DelIyr SC E)Ha arr TS MEXHIeITS.On ■ST91.O LIMITS Created in LDDT