MA0405-CS050512COl'FELL
Mayl2, 2005
Anthony Givens, President
Pavement Services Corp.
4000 Tarrant Main Road
Euless, TX 76040
RE:
Brick Paver Replacement Program
Project # MA 04/05
Dear Mr. Givens:
At the May 10, 2005 City Council meeting, the referenced project was awarded to your
firm. Enclosed with this letter are four original contract documents. Please execute the four
originals; provide the required bonds and return three of the executed documents to the
Engineering Depamnent. One of the executed documents is for your file.
To schedule a preconstmction conference on this project please contact Suzan Taylor,
Project Coordinator on this project, at 972/304-3679.
Sincerely,
Kermeth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
cc: Rick O'Dcll, Inspector