Loading...
MA0405-CS050527CITY, STATE, COUNTY · M~Y 27, 2005 BriCk Paver Replacement to Begin May 31 on MacArthur Boulevard. MacArthur Widening to Also Take Place Beginning May 31 through August 12, MacArthur Boulev~d will be reduced to one lane of traffic in each direction for roadway construction. Various lanes of MacArthur Boulevard will be closed to perform brick paver replacement. One lane of traffic each direction will be main- mined on MacArthur, however, several side streets will be closed to allow for the reconstruction, according to City Engi- neer Ken Griffin. The project is scheduled to take ap- proximately 60 days. Motorists should seek alternate mutes during this period. Motoristawill experience construction de- lays and inconveniences, said Griffin. At the same time, various lanes of MacArthur Boulevard will be Closed to construct a third southbound lane from Bethel School Road to north~ofBelt Line Road. One lane of traffic each direction will be maintained on MacArthur Boule- yard. The project is scheduled to take ap- proximately 75 days. "We apologize for any inconvenience this may cause," said Griffin. For ques- tions, contact Rick O'Dell, City Inspec- tor, at 972-304-7090, or the Engineering Department at 972-304-3679.