Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villas at LV-CS050511
.~i~///~OWD EY, ANDERSON & ASSOCIATES, FAX To: Keith Marvin (o: Oity Of Coppel' Fax: 97.. 04 ~5, 0 Phone: 972 304 3684 Re: Villas At La ke Vista Phase One FrOIll: Rodr~ey Louviere Bale: May 1!, 2005 CC: File Job #: 03067 v¥ith the recent changes to file water services I updated the inspection fee due to the City Of Coppe[I. understand the pre-con wll not set up until the fire chief gets the ~nformation that he has requesteo. Please call if you have am/ques/iu, ~s Than¼ y~u: Rodney Lodviero ~a~ 11 05 08:348 DOWNEY. RNBE~SOM&RSSOC. INC 19721931-6?87 CO?FELL CONSTRUCTION DEVELOPMENT PEILM1T APt LICA~I ION Name of AppBcant; _ /x9~(' Address:: /'7¥,qo Phonc Number: Survey/Abstract # Acreage Location description (attach vicinity map): ~ l'ype ol proposed construction or development: (~ ~.esident~a~ ( ) Alteralion of a natural wate[~vay drainage course I } Nc~i-resideniia[ ( ~ Other (describe & attach drawing or ~ ) }'lacemem of Fill (in rtght-~f-way or on private propeay) Description of Construction ~,X? Pavmg 0(,t SMe~alk ) Drive Appro~cl~ ) Zxcavatioh } Fire Laue ? Bridge Please provide Permit requested: (X) Median or Landscaping (,~) g~;ater 1Main <)0 O0 Sani~ry Sewer Ma~n ( ) Finme Inlet the name, address and 24 hour colltractor ~orkiog under this general permit. ( ) Box Ct~Ber~ ) Rip Rap F~li Area Drainage Chatme] Excavation Slope Protection/Retaining Wall >Parking Lot phone number for stlpervisor nf e~ery AF' ~onstn~ction shall be m coinpliance with, but not limited to, the City of Coppell Subdivision Orfimance, Standard Construciion Details. Streetscape Plan and approve~ ptmts. The coutractors shall adhere to the City's Erosion and Sedimentation Ordinance. Applicant shall provide a cop3' of approved plans, specificatinns and related cost estimate or contract uf the proposed construction for the purpose of permit fee calculations. C©NSTRUCTiON DEVELOPMENT PERMIT APPLICATION Page 2 A Construction Permi~ Fee i~! accordm~ce ,,vi*b 0re City of Coppell Fee Ordinance shall be paid prior to begiuning work. Amount Due: ~ ~3, ~4q c?© _ Date Paid: NOTE: A separate excavation permit is required ato'time pavement is cut or when there ~ work itt the rtght-of-w~v not approved by the C~ty Engineer, work requiring closing of a lane of traffic, street, or alley must be approved by the E~;,~.h~eer~ng Dept~ with notificalim~ t~ the followii~g prior to closing: Police Department @ 972-304-3600 Fire Department @ 972-304-3500 Street Department @ 972-304-3546 Engiueering Department @ 972~304~3679 A~tacb barricade piat~ / trench safety plan of a lane or street closure. (Required) No~e: S~reet ciosur.'.!s are allowed from 9:00 a.ln~ until 3:00 p,m~ ONL~ l~tlt'ess' ottierwtse ap.?o,,ed by Cit~ Engineer, A pre-construction meeting is required prior to begimdng work related to this permit. Contact the i~tspector to ~chednie meeting. City h~spector Contact Number(s) FOR CITY [!SE ONLY ~s i~e ill! are~ located m :m ~denlil~ed flood imzard area~ ( ) YES :( ) NO *~' ~T.S, ghent a l;?ooaplai~ Development Per,tit is required bqlbre any co~*scruct~ot~ cat~ begin. ~: addi~mna~ rnformatlon requi~ed7 ) YES ) NO Are other federal, state, or locai pernuts requires? ) YES ) NO ( ) PERMYF APPLICATION APPROVED ( ) PER3,ItT APPLICATION DISAPPROVED City Appre~ ai Date Ap£licant shall indcmmj3' attd forevcr hold harntless against the CiO' of Coppell each and ereo' ctaint, demand or cause of action that may be made or come against it ~)' reason oJ or tJ' any way artsing out of the ciosare, blocking, excavatittg, tutti,th, tunn¢liag, or other *york by the applicant under per,nit front lite Cio'. if such permit t~~ granted. Mm~ ~ ] 05 0~: 95m DOWDE¥.RHDERSO~&RSSOC. IHC [972193~-6787 p. ~ Ma~ ] ] 05 08:35a ]]OWDE¥.F~NDERSOH&ASSOC. IHC [972]931-~787 84.'2~,'2885 15;38 ~143579171 LH LACV COMPANV 82/83 III Lac. y Construction JOB NAME: LOCATION: BID f'3ATE: BiD TIME: ,i VILLAS AT LAKE VISTA PHASE [ (L~LL6. DRIVES) COPPELL, 1F. OkAS APRIL 22, 2005 5:00 PM II~-M NO, DESCRIPTION PAVINO I-)" SUB, GRADE pREPARATION LIMB :5" RB~NF CC,NC PARKING 6"~"-~" R~[NF GONC ALLEY ~VMT sTREET HEADER & ;UBTOTAL 2 YR 50% MAINTENANCE BON'D 'r O'I-AL BID t~ID QTY UNIT UNIT AMOUNT '14337 SY $1.69 $24,229.53 232 TN $I02 00 $23.084.00 9155 SY $22.60 1889 SY $22.90 2100 SY $27,10 $56,9"~0.80 1 LS $509.00 $509.00 58 LF $50.00 52.800,00 8 EA $1,125.00 $9,000.00 7850 SF S2 60 $20,41D.00 ;g350 SF $2.60 $6,11 o,oo $393,793 63 $398,705.63 1 LS $4,912,00 $4,942.00 PAGE I TOTALS: ~;298,708.63 JOB TOTALS: $,~98~705,63 Ha~ Il 05 08:35~ DOWDEY.RMDERSOH&RSSOC. p.6 danuaCY 3 2005 5225 VII LAG~ GREEK DR~VE SUITE 200 Pro~ect Name VIL~S AT LAKE VISTA, PHASE ONE pro~ect Location COPPELL, TE~S T~ q~ant~t[es I~ed i~ thi~sal are u~timat~ quanbties, and the adual ~rk pe~o~ed will YOUr accep~nce ~ thi~ pioposal by ~ifl9 and returning ~o copies to us within 10 days ~tl Ma~ 1 ! 05 08: 3Gm BOWDEY. RMDERSOM&RSSOC. IMC I~721~3! ~787 io.7 %NrC 2004 COPPELL. LP. cio DOWDEY, ANDERSON, & ASSOCIATES, INC. 5225 VILLAGE CREEK DRIVE SUITE 200 PLANO, TEXAS 75003 BID DATE: 1~3-2006 WATER, SEWER & DRAINAGE TO SERVE VILLAS A1 LAKE VISTA, PHASE ONE COPPELL, TEXAS REVISED: 5-9-2005 E~ID ITEM UNIT BID - TOTAL BID QUANTITY WATER - CITY OF COPPELL 3,342.00 -t F- 8" PVC DR 14 I 00 -EA- CUT-IN 12"x 5" TEE & 12" MAIN LINE VALVE 16.00 7.00 2.60 42.00 5.00 120.00 300.00 100,00 -EA- 8" GATE VALVE -EA- 6" GATE VALVE -EA- FIRE HYDRANT WI6" LEAD -TN- C.I. FITTINGS -EA- 1.5" x 1" BULLHEAD SERVICE (1" SETTER) -EA- t" WATER ~*ERVlCE (1" SETTER) -EA- 2" IRRIGATION SERVICE .EA- CONNECT TO EXISTING WATER -LF- DRY BORE wf14" CASING -LF- 4" IRRIGATION SLEEVE -LF- 24" IRRIGATION SLEEVE -LF- WATER TEST TOTAL WATER - CFTY OF COPPELL 15.55 51,968.10 4,500,00 4,650,00 620.00 9.920.00 435.00 3,046.o0 1.780.00 12,460.00 1,800.00 4,680.00 1,295.00 64,390.00 610.00 6,710.00 1,200.00 6,000.00 3.50,00 350.00 175.00 21 ,O00.O0 9.25 2,775.00 12.35 1,235.00 0.40 1,336.00 180,4'19.90 WATER -CITY OF LEWISVtLLE 3.00 .F_A. LOWER EXISTING 12" MAIN -- TOTAL WATER - CITY OF LEWISVILE 4,500.0~ 13,500.00 13,500.00 1,289.00 652.00 427.00 4.43.00 2.00 7.00 1.00 94.00 60.00 1.00 137.00 2.8tt.00 2,811.00 .SEWER -LF- 15" PVC SEWER -LE- 12" PVC SEWER -LF- 10" PVC SEWER -LF- 8" PVC SEWER -EA- 5' STD MANH~I E -EA- 4' STD. NLe, NHOLE -~- CONNECT TO EX. MANHOLE -EA- 4" SEWER SERVICES w/CLEANOUT ~LF- CONCRETE ENCASEMENT -E.A- ABANDON EX. MANHOLE -LF- DRY BORE WI20" CASING *LF- TRENCH SAFETY -LF- TEST & T V SEWER TOTAL SEWER 27.60 35,576.40 1840 7,856.80 10.35 7,243.05 4,02500 8,050.00 1,900.00 13,300.00 1.350.00 1,350.00 428.00 40,232.00 21.30 1.278.00 350.00 350.00 242.00 33,t54,00 O10 281.10 1,10 3,092.t0 t65,716.25 DRAINAGE - CITY OF LEWlSVILL; 5.00 -LF- 30" RCP 7.00 -LF- 30" RCP 5.00 J-F- 24'* RCP 1.00 -EA- TYPE "A'* STORM MANHOLE 1.00 -EA- CONNECT TO EX~ REC. INLE]' 1.00 ~.S- REMOVE EX. REC. INLET 1.00 -EA- CONNECT TO EX. 10' INLET 17.00 -LF- TRENCH SAFETY 61.00 427,00 2,82500 2,825.00 750.00 750.00 375.00 375.00 750.00 750.00 0.t0 1,70 TOTAL DRAINAGE - CiTY OF LEWISVILLE 6,748.70 Mm~ 11 05 08:9G~ I]Ot~DEY.RMDERSOM&ASSOC. IMC (~7~)S31-S787 p.8 DRAINAGE - CITY OF COPPE::gL 77.50 54.00 -LF- $6" RCP 51 88,00 -LF- 30" RCP 52.00 335.00 -LF- 27" RCP 46.$0 488.00 -LF* 24" RCP 40.75 770.00 -LF- 21" RCP 36.00 312.00 -LF- 18" RCP 9.00 -EA- 10' CURB INLET 2,125.00 2.00 -EA- 8' CURB INLET 1,950.O0 1.00 -EA- 2~' MOD. CURB INLET 3,500.00 1.00 -EA- 6' MOD. cURB INLET 2.025,00 1.00 ~A-4-GR~TE COMBO INLET 3~.50.00 2.00 -EA- 3~RATE COMBO INLET 3,025.0o t.00 -EA- 2-GRATE COMBO INLET 2.500.00 f1.00 -EA- TYPE "A" STORM MANHOLE 2,825.00 1 .O0 -EA- 3'x 3' DROP iN LET 1 ~.00 -EA-4'x 4' DROP INLET 2,047 00 -LF-TRENCH SAFETY 0.10 TOTAL DRAINAGE - CIT~ OF COPPELL 4,185.00 5,$88.00 17,420,D0 22,662,00 31,377,50 11,232,00 19,125.00 3,9OO.O0 3,500.00 2,025.00 3,450 6,050.00 2,500.00 2.825.00 1,900.00 2,000.00 20430 139.754.20 1.00 -LS- 2-yEA~ 100% BOND (LEWtSVILLE) 660_00 1.00 *LS-2.YEAR 50% BOND (COPPELL) 6,400.00 TOTAL WATER, SANITARY SEWER. 650.00 6,400.00 512,189.05 & STORM SEWER TOTAL MATERIALS NOTES: ' ~ ~-AN COMPLETE THIS PROJECT IN 32 WORKING DAYS. ~. ,~AVE NOT INCLUDED ANY SOILS OR CONCRETE TESTING, WE HAVE NOT INCLUDED ANY GRASSING OR LANDSCAPING, W~ HAVE NOT INCLUDED ANY EROSION CONTROL DEVICES, WE HAVE NOT INCLUDED ANY SWALES OR GRADE TO DRAIN. PVC PF~lCES ARE BASED ON DELIVERY BY END OF FEBUARY. 329,413 Ha~ ~ 05 08:3~a DO~DEY.R~DERSO~&RSSOC. ~HC (972193]-6787 p.9 24~tlOUR CONTACTS FOR VILLAS AT LAKE VISTA PHASE ONE Cullmn ( onstructioll Lf-I I.acy Dox~de.x. Anderson & Assoc. Paul Fox Jim 13rownlee Bill Jones Rodney Louviere 214.212.9611 214.g37.4561 214535.4826 469.576.1417 Notice of Intent (NOI) for Storm Water Discharges Associated with Construction Activity under the TPDE8 ~eneral Permit FMi~ORTANT: · Usc ~ attached INSTRUCI1ONS when complc~ng flus tbrm · ARer compleung flus form. uae ~e anach*d cUSTOMER CI.IECKLIffr to make eerlmn all lter~ are complete alld accurate, .Mi~mg, fllegll>le, or lrmccura~ lten~ may delay final acknowledgn~nt ot coverage ander thc general permlL Application F~: You must aubnm thc $100 NO[ Application Fee m ~Q u~er s~te ~ver (~ U~cbom) using ~c a~ch~ A~licafion F~ ~ubmi~l fo~. (~ NOT SEND A COPY OF ~E NO1 Wl~ Y~- APPLICATION FEE SUBMIX~AL FO~) [] Cmmty Government [] City Government []Other: [] y~ ~ No df governmental entity or a subsid(ary or par,. of a larger corporation, check "NO") 8 Number ot Employees: [~]0-20; []2L 100: []101-250; [] 251-500; or [] 501or higher B~iness Tax and Filing Numbers tnot applicable ~,~ Individuals, Go**~rnment, General Parmerships. and Sole Propnetorrhip~D BAd STate Franchise Tax ID Number: Federal Tax ID:~O - 200 ~ g'q~ _ -- (If knob, n) FX SOS Charier (filing) Numbe~:_ __ DUNS Number: ,~ Suite No.~Bldg.No: Code: 2. Billing Contact (Attn or 3 Count~ Mailing Information 0foulside USA) 'I'emtmy: Country (:ode: Postal Code: 4 Phone No: ) 5 FAX No. TCF,~ -20022 {'OY/12220~4) Maw i1 05 08:37a DOWDEY.AMDERSOM&ASSOC. IMC (9721931-6?87 p. 11 C. APPLICATION COblTACT ( I f TC~Qn°~xta --'~4--i ~' -m~fl inf°rmau°n r~g~dmg this a~lica~°m w~ ~Md ~ ~9 I TCEQ Issued KE Reference Number (RN) (ifa'Callable): 2 Name of Project or S~te: ~,/at- L ~} .~ //' 7" Standard Industrial Classification (SIC) cede: ~ ~"~-~. E. SITE MAILING ADDRESS (addre~ ['or rece ',lng marl at the site) [] Same As Opernlor (check if addrc£5 ts tile same, thell Dtx3ceed with Secnon F - Mailing &ddre~$: S'ait¢ No. B|dg. No.: City'; State; { ZIP Code: F. GENERAL CHARA(qqE-RIST1CS ' [] Y~ [] N~ I l las a Pollution Prevention PIm~ been prepared as r~mr~l n ~e general ~mut. If No. co',erage may be denied as the PPP :s ~equired a! the ume the NOI ~s submiRed to TCEQ. 2. Provide the eshmated area of la.nd distud~d (to the nearest acre): /~ Acres 3 Pro,,ide the name of the receiving water body (local strea~n, lake, drainage ditch), MS4 Operator U f applicable) and the segment ntunber where storm MS40perator:_~-f~_ 0I~ ~~'~'~'/I~cc' Receivthg Water Body: l~g't~ md/ C~:~ Segn~ent: May 1 t 05 08:38a DOWDEY.RMDERSOM&RSSOC. IMC (972193! 6?8? L oefliP/undel* pendly of law ttmt Ibis doeummt tnd sH allaclummt~ v~n~ pr~ under my ditec'dofl or sR~*~Smn m ~ ~th a ~ ~ to~s~nn~ dJat qutti§ed i~t~M~md jflu,,~ ga~J~'afld evMua~e the iflfoflmfiml submitled. Based e~ my inquiry of thc pq~*soo ~- pe~oos u,bo numqe the system, oF dJose pesMm, d~ res~o~a'Me ~w gatbcrmg the inf'ormafi~m, the infofmadon sublmtted ~s, to the best o£my ~ ~ ~, ~ ~ violibons. Mm~ ~1 05 08:38~ DOWDEY.RMDERSOM&RSSOC. IMC t972~931-~787 p. 13 Attachment 2 TPDES General Permit TXRIS0000 CONSTRUCTION SITE NOTICE FOR TIlE Texas Commission on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 The tblIowing tnformation is posted in compliance with Part II.D.2. of the TCEQ General Permit Number TXRIS0000 for discharges of storm water runoff from construction sites. Additional information regarding the TCEQ storm water permit program may be found on the internet at: www tnrcc state.tx.us/ ' ' ~destoml Contact Name and Phone Number: Project Description: (Physi~l address or description of the s~te's [o~tion, estimated stad date and projected ~ate, or date that disturbed soils will be Location of Storm Water Pollution Prevention Piao For Conslruction Sites Authorized Under Part ti D.2. (Obtaining Authorization to Discharge) the following certification must be completed: law that I have read and understand the eligibili~ requirements for claiming an authorization under Pan II.D2. of TPDES General Pe~it TXRIS0000 and agree to comply with the te~s of this pemir. A sto~ wa~er pollution prevention plan has been developed and implemented according m pemit requiremenm. A copy of this signed notice is supplied to ~e ope~tor of the MS4 if discharges enter an MS4 system. I am awm ~ere ~ si~ificant penalties for providing false in fo~adon or for conducting ~authoNzed discharges, including ~e possibili~ of fine and imp~soment for ~owing violations. Si~amre and Title Date Page 33