Villas at LV-CS050503 97~ 951 h?H,
Ma~' C,'.'] O.q 08: l~a I!OWDFY. RHD~RSON~R~OC. IftC ~8721~31-~787 p. 1
"~~OVVDEY, ANDERSON
& A$$0 ,CIAT!~$, INC.
CIV!L :Nt;i\E, RS
1o_!_ Keith Marvin I:~om: Rodney Louvlere
£'o: City Of Cop?et! Dale: May 3. 2005
Fax: 972' 304 3bi0 Pages: 9
Phonc: 972 304 3684 CC: File
l/e: Villas At Lake Vista Phase One .lob #: 03067
FAX
CaR you review the artacheo permit and set up a pre-construction meeting for above-mentioned project I will
bring the inspection fee to the meeting if that is ok
Please call if you have any questions
Thank yOLJ
Rodney Louviere
Mm~ 03 05 08: ISa DOWDE¥.~D~SOM&BSSOC. I~C (872)~3~-8787
COPPELL
CONSTRUCTION DEVEI.OPMENT PERMIT APPLICATION
Name of Applicant:
['hone Number:
B[sck #
OR
Loc #
, ur*'ey. Abstract #
Locatiun description (attach viciniO, map):
Acreage
proposed construction or development:
Resldentia~ ( ) Alteration of a natural waterx~ay drainage course
Ne~-resi0entia~ ( ) Other (describe & attach drawing or sketch)
l[~iacement of ];'ill (in tight-of-way or orr private property)
[:ire Lane
B6dge
Please provide the name,
Description of Construction Permit requested:
~'X~ Pa-'ing (X) Median or Landscaping
(X) Water Main
(~ R.C~,
()~ Sauitary Sewer Mare
( ) Flume
(X) Inlet
( ) Box Culvert
( ) Rip Rap
( ) Fit[ Aa~ea
· ', } Drainage Chamte[ Excavatio~
( } Slope Protection/Retalnmg Wal~
(~ Parking Lot
address and 24 hour phone number for supervisor of every
comractor working under this general permit.
construction shall be in compliance with, but not limited to, the City of Coppell
Subdivisiou Ordinance, Standard Construction Details, Streetscape Plan and approved
plaus. 't'he coutractors shall adhere to the City's Erosionand Sedm~entat~on' ~ ' Ordinance.'
Applicant shall provide a copy of approved plans, specifications and related cost estimate
or contract of thc proposed construction for the purpose of permit fee calculations.
MaW 03 05 08: tTa DOWDEY.R~DERSON&ASSOC. I~C 1972]93t 6787 p. 3
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
Page
A Canstruction Permit Fee in accordance wlth the City of Coppell Fee Ordinance shall be
paid prior to beginning work.
Amount Due:__'* 33 t ~_2~. /~ _ Date Paid:
NOTE: A separate excavation permit is required ato,time pavement is cur or when Ihere
~s worir itt Dte right-of-way not approved by thc City Engineer,
Any work requiring closing of a lane of traffic, street, or alley must be approved by the
Ettg~neering DepL witla notification, to the following prior to closing:
Police Department @ 972-304-3606
Fire Department @ 972-304-3500
Street Department @ 972-304-3546
Engineering Department @ 972-304-3679
Attach barricade plan / trench safety plan of a laue or street closure. (Required)
Wore: .~t~eet closures are allowed from 9:00 a,m. until 3:00 p,tu, ONLY unless otlterwise
appro red by City Engineer~
th~. m~spector to ~clledule meetmff.
pre-construction meeting is required prior to beginning work related to this permit. Coutact
Printed Name
Sigi~arure o!' Appiicant
City Inspector Contact Number(s)
FOR CITY USE ONLY
~s the fil~ area located in an identified flood hazard area? ( ) YES ( ; NO
(f YE& then a Floodplain Development Permit is required before att), construction can begim
~s addmonm information required? { ) YES ( NO
,Are other federal, state, or local ~ , r NO
pernuts reqmres. ( ~ YES ~
PERMIT APPLICATION APPROVED ( PERMIT APPLICATION DISAPPROVED
Cit.;, Approva; Date
Applicant shall indemnify and forever hold harmless against the Ci0, of Coppell each and ever), claim, demand
or cause of actiozt that tnay be tttade or cotne against it by reason of or i.f any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other wor/~ by the applicant under permit from the City, if suct}
pe~Tnit is granted.
~m~ 03 05 08: 17m DOWDEY.AMOE~SOM&ASSOC. IMG ~872]~31 8787
41403 ~I ,' 1 LH LACY COMPANY
p.5
PAGE 02/03
ILacy
Constru(ti5n
JOB. NAME: VILLAS AT LAKE VISTA PHASE I (L~_~V1LLE DRIVES)
LOCATION: C, OPPELL TE)r,.AS
BID DATE: APRIL 22, 2005
BiD ,'TIME' 5:00 PM
NO, I)ESCRIPT~ON
PAVING
¥~ f~" SUSGRADE PREPARATION
"LIME (3Z#/SY)
" 6" REIN,~ CONC PVMT
Z Y* !~' REINF CONC PARKING
~'¢ [J"-8"-5" REINF GONO ALLEY PVMT
Z'¢/o mARKING STALL STRIPING
¢'f. STREET PFAOER A BARRICADE
¥~'. 5' STDEWALK ~-'
SUBTOTAL $393,793.§3
2 YR 50% MAINTENANCE BOND
¥Oq'AL , $398,705.63
B~D ..... BID
QTY UNIT UNIT AMOUNT
14337 SY $1.Bg ,$24.229.53
232 TN $102.00 $23,654.00
9155 Sy $22.60 $205,$03.00
1869 SY $22.g0 $43,2~6,10
2100 BY $27,10 $56,910 O0
1 LS $509.00 $50g_DO
50 LF $50.00 $2,500,00
8 EA $1,125~00 $9,000.00
7850 SF $2.80 $20,410.00
2350 SF $260 $6,110,00
1 LS $4,912.00 $4,91200
PAGE I TOTALS:
JOB TOTALS: $396~705,63
I'1~ Og 05 Og: 17~ DObJDEY. AI'IDE~OIH&A~OG. Il'lC
[97~1~31-~787
p.6
WPC 2004 COPPELI , L P
rJo DOWDY, ANDERSON & ASSOCIATES, ~NC.
5225 VILLAGE CREEK DRIVE
SUITE 200
F[A'NO. TEXAS 75093
Project Name: VILLAS AT LAKE VISTA, PHASE ONE
Project LocaIion: COPPELL, TEY~,S
For quantities end prices please s~ the a~c~ed list
3
4.
5
Our proposat~s b~Yon our ut~Iity work ~ installed p~r lc any new Gas
Phone Electro Cable or other utilities being installed
We will set all m~r~hole.~ cleano~$, fire hydrants= valve boxes and in,et tops to
grades providedJ~y~y~_ec~.q~er~ o~ ed~!n=! ~=t=~13tion. Any chBnges required
after the initial insfallatlon will oe at the ~yrmrs expense
The quanbfies ~isted in this proposal are estimated quanM~es, and the actual work performed ~1!
CuJa~Constl'uctibn Co~;~ By:..
DOWDEY. RHDERSOH&R$SOC. I HO
(972)931-6787
p.7
WPE 2004 COPPELL, L.P.
c/o DOWDEY, ANDERSON, & ASSOCIATES, INC.
5225 VILLAGE CREEK DRIVE
:~UITE 200
PL.ANO, I~n~AS 75093
ITEM
BID DATE: 1-3-2005
W~TER, SEWER~& DRAINAGE TO SERVE
VILLAS AT LAKE VISTA, PHASE ONE
COPPEL[, TEXAS~
QUANTITY
WATER - CiTY OF C0PPELL
3.342.00 4.F- 8" PVC DR 14
1.O0 -EA- CUT.IN 12"x 8" TEE & 12" MAIN LINE VALVE
16.00 -EA- 8" GATE VALVE
7.00 0" GATE vALvE
2.60 -TN- c.,.
ZTo 4.00 1 IRmGATIONSE,WCE
Z% 1.~0 .-F_A. Z" IRRIGATION SERV[CE_
1.00 -F.A- CONNECT TO EXISTING WATER
120.00 -LF. DRY BORE w/14"
2~ 300.00 -LF. 4" IRRiGATiON SLEEVE
2 ~ t0~.00 -LF- 2-4" IRRIGATION ~LEEVE
3,342.00 -LF- WATER TEST
TOTAL WATER -
WATER - CITy OF LEWlSVILLE
3.00 -EA- LOWER EXISTING
TOTAL WATER - CITY OF
UNIT BID tOTA~iD -
15.55 5t,958.10
4,~S0.00 4~0
620.00 9,920.00
435,00 %O45.6O
1,7~0.00 12,46~.00
1,800.00 4,880,00
522.00 49,068.00
650.00 2,600.00
1,200.00 1,200.00
350.80 350.00
175.00 21,000.00
9.25 2,/75.00
12.35 1,235,00
0.40 1,336,50
166,187.90
4,$00.00 13,500.0~
SEWER
-LF- 15" PVC SEWER
13,500.0~
652,[X) -LF- 12" PVC SEWER
427.00 -LF- 10" PVC SEWER
443.00 -LF- 8" PVC SEWER
2.00 -EA- 5' STD. MANHOLE
7.00 -EA- 4' STD. MANHOLE
1.00 --EA- CONNECT TO EX.
94.00 -EA- 4" SEWER SERVICES w/CLEANOUT
60.00 -LF-
27.60 $5,$T6.40
21.40 13,952.80
18.40 ?,856.60
16.35 7,243.09
4,025.06 8,050.00
1,900.00 13,300.00
1,350.00 1,350.00
428.00 40,232.00
1.00 -EA- ABANDON EX, M~NHOLE
137.00~ -LF- ORY BORE wi20" CA.~,ING-
2,811.00 -LF- TRENCH SAFETY
2,811.00- -LF- TEST & T V SEWER
TOTAL SEWER
DRAINAGE - CITY OF LEWISVILLE
5.00 -LF- 36" REP
7.00 -LF- 30" REP
[~ -LF- 24" RCP
1.00 -EA- TYPE "A" STORM MANHOLE
1.00 -EA- CONNECT TO EX. REC. INLE~
I.GO 4.$. REMOVE EX. REC. INLET
1 O0 -EA- CONNECT TO J~X: 10' INLE~
t 7.00 -LF- TRENCH ;AFET¥
21.30 1,278.00
242.00 33,1~4.~
0.10 281.10
1.10 3,092.10
77.50 387.50
61.00 427.00
4630 232.50
2,826.00 2,825.00
790,00 7'SO.O0
3}'5.00 375.00
760.00 }'50.00
0,10 130
TOTAL DRAINAGE. CTT~ ~TFL~wt~VILLE
5,748.70
H.a~ 03 OS 08; ~Ba
DOWDEY. RMOERSOM&FiSSOC. I~C
p.B
DRAINAGE . CITY OF COPPELL --
54.00 -LF- $$" RCP
88.00 -LF- 30" RCP
488.00 -LF- 24" RCP
$12.00 -LF- 18" RCP
9.OO -EA- 10' CURB INLET
2.00 -EA- 8' CURB INLET
1,00 -FA Z,-8.' MOD_ CURB INLET
1.00 -EA- 6' MOD. CURB INLET
1.00 'EA- 4-GRATE C OM BO4N~.ET
2.00 .,EA- 3-GRATE COMBO INLET
1.00 -EA- 2.,GRATE COMIBO INLET
1.00 -EA- TYPE "A" STORM MANHOLE
1,00 -EA- 3'x 3' DROP INLET
1.00 -EA- 4'x 4' DROP INLET
2,047.00 -LF- TRENCH SAFETY
TOTAL DRAINAGE - CITY OF COPPELL
77.5~ 4,18~.00
61.00 5,365.00
52.00 17',420.00
46.50 22,692.O0
40.75 31,377,50
36.00 11,232,00
2,125.00 19,125.00
1,950.00 3,900.00
3,500.00 3,500.00
2,028.00 2,025,00
3,4S0,00 3,480,00
3,025.00 6,050.00
2,500.00 2,500.00
2,825.00 2,825.00
1,900.00 ?,900.00
2,000.00 2,000.00
0.10 204.70
1.00 -J-.S- 2-YEAR 100% BOND {L~
1.00 -LB. 2-YEAR 50% BOND (COPPELL)
TOTAL WATER,, 8A~
139,754.20
65~.~ 650.00
6,200.00 6,200,00
& STORM SEWER
497,757.05
TOTAL MATERIALS
NOTES:
WE CAN COMPLETE THE PROJECT IN 32 WORKING ~
WE HAVE NOT INCLUDED ANY SOILS OR CONCRETE TESTING.
WE HAVE NOT INCLUDED ANy GRA~.~ING O~ LANDSCAPING.
WE HAVE NOT INCLUDED ANY EROSION CONTROL DEVICES.
WE HAVE NOT INCLUDED ANY SWALES OR GRADE TO DRAIN.
PVC PR'IC'E~%~,~· BASED ON u~=LIIZE-R¥ BY E'I~D OF ~-EBUARy,
~mW 03 05 08: 1Sa OOWOEY.R~DE~SOM&RSSOC. IMC (~?~)~31-6787 p.9
24-HOIiR CONTACTS FOR VILLAS AT LAKE VISTA PHASE ONE
Weir
('ulium Construction
LH Lacy
Dowdey. Andcrson& Assoc.
Paul Fox
Jim Brownle¢
Bill Jones
Rodncy i,omicrc
214.212.9611
214.837,456I
214.535.4826
469.576. I417