Loading...
WA0101-CS050526 (2)BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., #220 Dallas, Texas 75231 Fax (214) 361-0204 Phone (214) 361-7900 JOHN W BIRKHOFF, PE. RONALD V CONWAY, P.E GARY C HENDRICKS, PE JOE R CARTER, P.E. PAULA CARLINE, PE MATT HICKEY, P.E. DOUGLAS K. SHOWERS, PE Mr. Luis Velas~¢~ Fox Con~a.~t6rs, Inc. P.O. B~951 _ M~thian, Texas 76065 RE: Field Change No.2 SH 121 Water Line Coppell, Texas Dear Mr. Velasquez: May 26, 2005 We have met on site on Friday May 20 and Wednesday May 25 to review the location of the proposed water line and it's proximity to the Grande Communications fiber optic cable in the vicinity of Station 36+00 to 37+00 at the reference project site. At these site meetings the following personnel were in attendance: May 20 & 25 Larry Davis, City of Coppell Inspector Luis Velasquez, Contractor Eddie Arnold, Boring Contractor Douglas Showers, Design Engineer May 20 Suzan Taylor, City of Coppell Frank Martinez, Grande Communications May 25 Tommy McKinnon, TxDOT Bob Fox, Contractor Based on conversations with TxDOT and the City of Coppell, it has been agreed to install the line in this location by open cut and place it approximately 3-feet back of and parallel to the SH121 service road curb. The line shall be laid over the top of the existing box culvert with the flow line being 0.5 feet above the top of culvert. The line shall be encased in flowable fill to a cover of 2-feet above the top of the water line. The existing ground shall be restored. This change will eliminate the blow off valve and relocate the air release valve. The attached layout sheet indicates the intention of this field change. Based on this information you may proceed with the field change. Please mark your field drawings to reflect this change so that the "record" drawings can be accurate. Sincerely, ~? /y?. n~ "~'~ // /~Z. ~.~--. D~gla K(_~. howers, P.E. Enclosure /~ C.C. Mr. Lar~ Davis, Ms. Susan Taylor, Mr. Keith Marvin, P.E. Frank Martinez, Tommy McKinnon i~1r~ m"rg