Loading...
WA0101-LR050607Construction Materials Testing and Environmental Consulting .exas CMT, Ilq. C. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352.6972 www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Re ~ort No. l (205-0147) Method: ASTM D2922 D3017 D698 Pa~e I of 1 Project: Hwy. 121 Water Line (LbsdCuVt) Pcrccm Report Date: June 7, 20115 Required Density (%): 95% -100% Required Moisture (%): 0 to +5% omc 2 Retest of Test Location #2 I 106,1 20,1 95.0 2 Retest of Test Location # 11 2 107,4 19.4 96.2 3 Retest of Test Location #12 3 6" 106.7 13.1 95.0 2 Retest of Test Location # 13 4 / 111.6 16.6 I00.0 2 Retest of Test LocgtiOn/415 / 111.0 18.1 99.4 5 6" /Test results meet project specifications cc: Ms. Suzan C. Taylor - City of Coppcll ~"~r [;trr) Davis City of Coppcll Mr Luis Velusquez - Fox (2ontractors. [nc. Mr Douglas K Showers ~ Bukhoff, ltendricks & Conway. LLP