Loading...
RC Townhomes-CR041005SITE INSPECTION CHECKLIST FOR TOWNHOMES OF COPPELL 400 MACARTHUR DRIVE COPPELL, TX 76019 SECTION I - GENERAL ] Inspections shall be performed once every 2 weel~ and within 24 hours after a storm event of O. 5 inches or more. Alternatively, inspections may be performed every 7 days without additional inspections after rain events. PROJECT ADDRESS/TRACT: 400 S. MacArthur Blvd., Coppell, Texas 75019 . SITE REPRESENTATIVE: DEVELOPER NAME: DATE OF INSPECTION: WEATHER CONDITION: SEASON: DEVELOPMENT SIZE: TYPE OF CONSTRUCTION: Ron Lustig JR Rose Development LLC ~ET (October 1 through April 30) [] DRY (May I through September 30) 4.424 Acres Residential 48 Unit Townhome Devalovment SECTION II - RESULTS OF INSPECTION Erosion Control Practices Y N N/A Comments I Are erosion controls being implemented and maintained on inactive and active disturbed soil areas (sheeting, mulch, hay, soil stabilizers, cte), in accordance with Erosion and Sediment Control Plans (ESCPs) and provisions of the Gradinl~ Ordinance? 2 Erosion observed? If YES, describe thc evidence of the erosion and whether it is major or minor. Sediment Control Practices Y N N/A Comments 3 Are sediment controls being implemented and maintained on all significant slopes (silt fences, fiber rolls, ere at the b~sc of slopes) and thc downsffeam perimeter, in accordance with Erosion and Sediment Control Plans (ESCPs) and provisions oftbe Grading Ordinance? 4 Sediment discharge obse~ red? If YES, describe the evidence of the discharge and whether it is major or minor (If the discharge could impact wildlife, sensitive habitaffendangered species, an impared water body (303d listed), ESA or ASBS area, go to the "Evaluation of 1 to Human or Environmental Health" form) Tracking Controls Y N N/A Comments 5 Are the entrances and exits to the construction site adequately protected (tire washout~ stabilized entrances~ rumble strips)? 6. Are roads free of sediment? Waste and Disposal Management Y N N/A Comments 7 Arc activities such ~s concrete/plastering, painting and fi~cling resulting in a discharge to the storm drain in violation of provisions of the Water Quality Ordinance? lYES, descr be the ev dence of the discharge and whether it is major or minor 8 Are containers for construction waste and debris being utilized and are they adequate? 9 Are there potential water quality problems that have been identified on the site which may be in rio at on ofprov sons of he Water Quality Ordinance and may require further inspection by an Authorized Water Quality Ordinance Inspector? 10 Are there any discharges or spills of sewage, oil, or toxic/hazardous materials, which may be in violation or'provisions of the Water Quality Ordinate? If YES, go to the "Evaluation of Potential Impacts to lluman or Environmental Health" form. SECTION III - ENFORCEMENT ACTIONS PRIVATE CONSTRUCTION PROJECTS NOTES: 71 Issued a Notice of Nond2ompliance ~l Issued an Administrative Compliance Order rq issued a Cease and Desist Order [] /i~sued a Stop Work Order [21/ No Action Required [] Request Inspection by an Authorized Water Quality Ordinance Inspector [] Other (Please Explain):