Loading...
RC Townhomes-CR041007SITE INSPECTION CHECKLIST FOR TOWNHOMES OF COPPELL 400 MACARTHUR DRIVE COPPELL, TX 76019 SECTION 1 - GENERAL I Inspections shah be performed once every 2 weel~ and within 24 hours after a storm event of 0.5 inches or more. Alternatively, inspections may be performed every 7 days without additional inspections after rain events. PROJECT ADDRESS/TRACT: 400 S. MacArthur Blvd.. CoDvell. Texas 75019 . SITE REPRESENTATIVE: DEVELOPER NAME: DATE OF INSPECTION: WEATHER CONDITION: SEASON: DEVELOPMENT SIZE: TYPE OF CONSTRUCTION: Ron Lusfig JR Rose Development LLC ~'~/ET (October 1 throug~ April 30) r~ DRY (May I through September 30) 4.424 Acres Residential 48 Unit Townhome Development ,¥ SECTION II - RESULTS OF INSPECTION Erosion ControIPractices Y N N/A Comments I Are erosion controls being implemented and maintained on inactive and active disturbed soil areas (sheeting, mulch, hay, soil stabilizers, etc), in accordance with Erosion and Sediment Control Plans (ESCPs) and provisions of the Grading Ordinance7 2 Erosion observed9 / If YES, describe the evidence of the erosion and whether it is major or minor Sediment Control Practices Y N N/A Comments 3 Are sediment controls being implemented and maintained on all significant slopes (silt fences, fiber rolls, ete at the b~se of slopes) and the downstream perimeter, in accordance with Erosion and Sediment Control Plmrs (ESCPs) and provisiorm of the Grading Ordinance'? __ 4 Sediment discharge observed9 If YES, describe the evidence of the discharge and whether it is major or minor (If tbe discharge could impact wildlife, sensitive habitaffendangered species, an ,/ - impared water body (303d listed), ESA or ASBS area, go to the "Evaluation ofl to Human or Environmental Health" form ) Tracking Controls Y N N/A Comments 5 Are the entrances and exits to the construction site adequately protected (tire washout, stabilized entrances, rumble strips)? 6 Are roads flee of sediment? Waste and Dispos~lManagement Y N NIA Comments 7 Are activities such as concrete/plastering, painting and fueling resulting in a dischm-ge to the storm drain in violation of provisions of the Water Quality Ordinance? If YES, describe the evidence of the discharge and whether it is major or minor 8 Are containers for construction waste and debris being utilized and are they adequate? __ 9 Are there potential water quality problems that have been identified on the site, which may be in violation of provisions o£the Water Quali~ Ordinance and may require further inspection by an Authorized Water Qualiiy Ordinance Inspector? 10. Are there any discharges or spills of sewage, oil, or toxic/hazardous materials, which may be in violation of provisions of the Water Quality Ordinace9 If YES, go to the "Evaluation of Potential impacts to lluman or Environmental Health" form SECTION Ill - ENFORCEMENT ACTIONS PRIVATE CONSTRUCTION PROJECTS NOTES: Issued a Notice of Non-Compliance Issued an Administrative Compliance Order Issued a Cease and Desist Order ~sued a Stop Work Order ~4~ o Action Required Request Inspection by an Authorized Water Quality Ordinance Inspector Other (Please Explain):