Loading...
RC Townhomes-CR041028SITE INSPECTION CHECKLIST FOR TOWNHOMES OF COPPELL 400 MACARTHUR DRIVE COPPELL, TX 76019 SECTION I- GENE L Inspections shah be performed once every 2 weets and within 24 hours after a storm event of 0.3 inches or more. Alternatively, inspections may be performed every 7 days without additional inspections after rain events. PROJECT ADDRESS/TRACT: 400 S. MacArthur Blvd., Coppell, Tex~ 75019 . SITE REPRESENTATIVE: DEVELOPER NAME: DATE OF INSPECTION: WEATHER CONDITION SEASON: DEVELOPMENT S1ZE: TYPE OF CONSTRUCTION Ron Lusfig JR Rose Development LLC ~ /~_f~/ ,~'r~ ~VET (October 1 through April 30) ~ DRY (May 1 flu'ough September 30) 4,424 Acres Residential 48 Unit Townhome Develovment SECTION I! - RESULTS OF INSPECTION Erosion Control Practices Y N N/A Comments 1. Are erosion controls being implemented and maintained on inactive and active dislurbed soil areas (sheeting, mulch, hay, soil stabilizers, etc.), in accordance with Erosion and Sediment Contel Plans (ESCPs) and provisions of the Grading Ordinance'? 2 Erosion observed? If YES, describe the evidence of the erosion and whether it is major or minor Sediment Control Practices Y N NIA Comments 3 Are sediment controls being implemented and maintained on all significant slopes (silt fences, fiber rolls, etc at the base of slopes) and the downstream ~enmeter, in accordance with Erosion and Sediment Control Plans (ESCPs) and ~. )rovisions of the Grading Ordinance? 4 Sediment discharge obsetwed? If YES, describe the evidence of the discharge and whether it is major or minor If the discharge could impact wildlife, sensitive habitat/endangered species, an impared water body (303 d listed), ESA or ASBS area, go to the "Evaluation of 1 to Human or Environmental Health" form ) Tracking Controls Y N N/A Comments 5 Are the entrances and exits to the construction site adequately protected (tire washout, stabilized entrances, rumble strips)? ~-~ 6 Are roads fi-ce of sediment ? Waste and DisposaIManagement Y NTM N/A~' Comments 7 Are activities such as concreta/plastaring, painting and fueling resulting in a discharge to thc storm drain in violation of provisions of the Water Quality Ordinance? If YES, describe the evidence of the discharse and whether it is major or minor 8 Are containers for construction waste and debris being utilized and are they adequate? 9 Are there potential water quality problems that have been identified on the site, which may be in violation of provisions oftbe Water Quality Ordinance and may require fixrther inspection by an Authorized Water Quality Ordinance Inspector? 10. Are there any discharges or spills of sewage, oil, or toxic/hazardous materials, which may be in violation of provisions of the Water Quality Ordinate? If YES, go to the "Evaluation of Potantial Impacts to Human or Environmental Health" form SECTION III - ENFORCEMENT ACTIONS PRIVATE CONSTRUCTION PROJECTS NOTES: Issued a Notice of Non4~:ompliance Issued an Administrative Compliance Order Issued a Cease and Desist Order [] I ued a Stop Work Order ~1~ Action Required [1 Request Inspection by an Authorized Water Quality Ordinance Inspector Fl Other (Ple~qe Explain):