Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST9302-LR001218
ALPHA TESTING, INC. 2209 Wisconsin St., Suite 10 Dallas, Texas 75229 (972) 620-8911 Concrete Compression Test Report Tested For: CITY OF COPPELL ATTN: KEN GRIFFIN 255 PARKWAY BLVD. COPPELL, TX 75019 Fax Number: (972) 304-3570 Project Deec: SANDY LAKE ROAD PROJ NO. ST 93 COPPELL, TEXAS Our Report No.: 98881-180 I~eue Date: 12/18/2000 FIELD DA TA Placement Location: Date Placed: Time Placed: Slump (ASTM C-143): Air Content: Air Temperature: Specimen Temperature: Date Received: Delivery Method: Field Defa 8ubmittecl By:. Mix Date Submlttecl By: PAVING, 35~/V & 60'N FROM NW CORNER OF 489 SANDY KNOLL 12/11100 10:00 AM 2.5 4 (ASTM C-173) 4O 12/12/00 PICKED UP BY ALPHA RUNEWlOZ, DANIEL N/A Plant Number:. N/A Delivery Ticket No.: N/A Made B~. ALPHA Cured Speciflcetion: ASTM C-31 CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max NO.: T~I~: S~ec: Teated.: ~[DI~: Lenl~lth Width DlemMer S~.ln. Load: PSh 248 LAB C-1231 12/t8/00 7 12 N/A 6 28.27 104160 3680 249 LAB 118/01 28 12 N/A 6 28.27 0 250 LAB 1/8/01 28 12 N/A 6 28.27 0 251 LAB HOLD HOLD 12 N/A 6 28.27 0 · SpeciflcetJone: 2~ 3600 Reaulte to Date: N/A Notes: