Loading...
RC Townhomes-CR041101SITE INSPECTION CHECKLIST FOR TOWNHOMES OF COPPELL 400 MACARTHUR DRIVE COPPELL, TX 76019 SECTION I - GENERAL I Inspections shah be performed once every 2 weeks and within 24 hours after a storm event of 0.5 inches or more. Alternatively, inspections may be performed every 7 days without additional inspections after rain events. PROJECT ADDRESS/TRACT: 400 S. MacArthur Blvd., Coppell, Texas 75019 SITE REPRESENTATIVE: DEVELOPER NAME: DATE OF INSPECTION: WEATHER CONDITION: SEASON: DEVELOPMENT SIZE: TYPE OF CONSTRUCTION: Ron Lustig JR Rose Development LLC ~ WET (October 1 through April 30) [] DRY (May I through September 30) 4.424 Acres Residential 48 Unit Townhome Develooment SECTION I! - RESULTS OF INSPECTION Erosion ControIPractices Y N N/A Comments 1 Are erosion controls being implemented and maintathcd on inactive and active disturbed soil areas (sheeting, mulch, hay, soil stabilizers, etc), in accordance with Erosion and Sediment Control Plans (ESCPs) and provisions of the Grading Ordinance? 2 Erosion observed? If YES, describe the evidence of the erosion and whether it is major or minor. Sediment Control Practices Y N N/A Comments 3 Are sediment controls being implemented and maintained on all significant slopes (silt fences, fiber rolls, etc at the base of slopes) and the downstream perimeter, in accordance with Erosion and Sediment Control Plans (ESCPs) and provisions of the Grading Ordinance? 4 Sediment discharge observed? If YES, describe the evidence of the discharge and whether it is major or minor (lftbe discharge could impact wildlife, sensitive habitat~endangered species, an impared water body (303d listed), ESA or ASBS area, go to the "Evaluation of 1 to Human or Environmental Health" form) Tracking Controls Y N N/A Comments 5. Are the entrances and exits to the construction site adequately protected (tire washout, stabilized entrances, rumble strips)? 6. Are roads free of sediment?~N/AL Waste and DisposaIManagement Y N Comments 7 Are acfivifies such as concrete/plastering, painfing and f~eling resulting in a discharge to the storm drain in violation of provisions of the Water Quality Ordinanca? If YES, describe the evidence of the dischars;e and whether it is major or minor. 8 Are containers for construction waste and debris being utilized and are they adequate? 9 Are there potential water quality problems that have been identified on the site, which may be in violation of provisions of the Water Quality Ordinance and may requiw further inspection by an Authorized Water Quality Ordinance Inspector? 10. Are there any discharges or spills of sewage, oil, or toxic/hazardous materials, which may be in violation of provisions of the Water Quali~y Ordinaee? If YES go to the"Evaluation ofPotenfia lmpac s o Human or Environmental Health" form. SECTION III - ENFORCEMENT ACTIONS PRIVATE CONSTRUCTION PROJECTS NOTES: Issued a Notice of Non-Compliance Issued an Administrative Compliance Order lssueq a Cease and Desist Order [] ed a Stop Work Order ~No ~cfion Required ~ Request Inspection by an Authorized Water Quality Ordinance Inspector ~1 Other (Please Explain)