Loading...
RC Townhomes-CR041107SITE INSPECTION CHECKLIST FOR TOWNHOMES OF COPPELL 400 MACARTHUR DRIVE COPPELL, TX 76019 SECTION I - GENERAL Inspections shall be performed once every 2 weeks and within 24 hours after a storm event of 0.5 inches or more. Alternatively, inspections may be performed every 7 days without additional inspections after rain events. PROJECT ADDRESS/TRACT: 400 S. MacArthur Blvd., Coppell, Texas 75019 . SITE REPRESENTATIVE: DEVELOPER NAME: DATE OF INSPECTION: WEATHER CONDITION: SEASON: DEVELOP~T SIZE: TYPE OF CONSTRUCTION: Ron Lusfig IR Rose Develooment LLC it [~ [~ET (October 1 through April 30) D DRY (May I through September 30) 4424 Acres Residential 48 Unit Townhome Develovment SECTION II - RESULTS OF INSPECTION Erosion Control Practices Y N N/A Comments 1 Are erosion controls being implemented and maintained on inactive and active disturbed soil areas (sheeting, mulch, hay, soil stabilizers, etc.), in accordance with Erosion and Sediment Control Plans (ESCPs) and provisions of t~. ~ the Gradthl~ Ordinance? 2 Erosion observed? If YES, describe the evidence of the erosion and whether it is major or minor, g'~ " Sediment ControlPractices Y N N/A Comments 3 Are sediment controls being implementad and maintained on all significant slopes (silt fencca, fiber mils, etc at the base of slopes) and the downstrearn perimeter, in accordance with Erosion and Sediment Control Plans (ESCPs) and ~ prov sions of the Gradth~ Ocdthance? 4 Sediment discharge observed? If YES, describe the evidence of the discharge and whether it is major or minor (If the d scharge cou d mpact wdl re, sensitive habitaffendangered species, an ~, · impared water body (303d listed), ESA or ASBS area, go to the "Evaluation ofl to Human or Environmental Health" form) Tracking Controls Y N N/A Comments 5 Are the entrances and exits t~ the construction site adequately protected (tire washout, stabilized entrances~ nunble strips)? ~ 6 Are roads free of sediment9 ~. Waste and DisposaIManagement Y N N/A Comments 7. Are activities such as concrete/plastering, painting and fueling resulting in a discharge to thc storm drain in violation of provisions of thc Water Quality adequate,? ~ SECTION 1II - ENFORCEMENT ACTIONS PRIVATE CONSTRUCTION PROJECTS NOTES: [] Issued a Notice of Non-Compliance Issued an Administrative Compliance Order Issued a Cease and Desist Order Issued a Stop Work Order [] No Action Required [] Request Inspection by an Authorized Water Quality Ordinance Inspector [] Other (Plem~e Explain):