Loading...
RC Townhomes-CR050202SITE INSPECTION CHECKLIST FOR TOWNHOMES OF COPPELL 400 MACARTHUR DRIVE COPPELL, TX 76019 SECTION I - GENERAL Inspections shall be performed once every 2 weeks and within 24 hours after a storm event of 0.5 inches or more. Alternatively, inspections may be performed every 7 days without additional inspections after rain events. SITE REPRESENTATIVE: DEVELOPER NAME: DATE OF INSPECTION: WEATHER CONDITION: SEASON: PROJECT ADDRESS/TRACT: 400 S. MacArthur Blvd., Coppelk Texas 75019 Ron Lustig JR Rose Development LLC ~ I~ / .,'-/ ~"~ET (October I through April 30) ~ DRY (May 1 through September 30) DEVELOPMENT SIZE: 4 424 Acres YYPE OF CONSTRUCTION: Residential 48 Unit Townhome Development SECTION II - RESULTS OF INSPECTION Erosion Control practices Y N N/A Comments I Arc erosion controls being implemented and maintained on inaedvc and active disturbed soil areas (sheeting, mulch, hay, soil stabilizem, crc ), in accordance with Erosion and Sediment Control Plans (ESCPs) and provisions of the Grading Ordinancc9 2 Erosion observed? If YES, describe the evidence of the erosion and whether it is major or minor. Sediment Control Practices Y N N/A Comments 3 Are sediment controls being implemented and maintained on all significant slopes (silt fences, fiber rolls, etc at the base of slopes) and the downstream perimeter, in accordance with Erosion and Sediment Control Plans (ESCPs) and provisions of the Grading Ordinance? 4 Sediment discberge observed? If YES, describe the evidence of the discharge and whether it is major or minor (If the discharge could impact wildlife, sensitive habitaffendangered species, an impared water body (303d listed), ESA or ASBS area, go to the "Evaluation of I to Human or Environmental Health" Ibm.) Tracking Controls Y N N/A Comments 5 Are the entrances and exits to the construction site adequately protected (tire w~shout, stabilized entrances, nmable strips)? 6 Are roads flee ofsadiment? Waste and DisposaIManagement Y N N/A Comments 7 Are activities such as concrete/plastering, painting and fi~eling resulting in a discharge to the storm drain in violation of provisions of thc Water Quality Ordinance'~ If YES, describe the evidence of the discharse and whether it is major or minor 8 Are containers for construction waste and debris being utilized and are they adequate? 9 Are there potential water quality problems that have been identified on tbe site, which may be in violation of provisions of the Water Quality Ordinance and may require fiarther inspection by an Authorized Water Quality Ordinance Inspector? 10. Are there any discharges or spills of sewage, oil, or toxic/hazardous materials, which may be in violation of provisions of the Water Quality Ordinace~ / If YES, go to the "Evaluation of Potential Impacts to Human or Environmental Health" form. SECTION !I1 - ENFORCEMENT ACTIONS PRIVATE CONSTRUCTION PROJECTS NOTES: 1~ Issued a Notice of NonCompliance FI Issued an Administrative Compliance Order [] Issued a Cease and Desist Order ~ Issued a Stop Work Order ~ NoAction Required [] Request Inspection by an Authorized Water Quality Ordinance Inspector ~1 Other (Please Explain)