Loading...
RC Townhomes-CR050314SITE INSPECTION CHECKLIST FOR TOWNHOMES OF COPPELL 400 MACARTHUR DRIVE COPPELL, TX 76019 SECTION ! - GENERAL Inspections shall be performed once every 2 week. v and within 24 hours after a storm event of O. 5 inches or more, Alternatively, inspections mc~, be perft~rmed ever), 7 days without additional tn3~ection3 after rain events. PROJECT ADDRESS/TRACT: 400 S. MacArthur Blvd Core. IL Texas 75019 SITE REPRESENTATIVE: DEVELOPER NAME: DATE OF INSPECTION: WEATHER CONDITION: SEASON: DEVELOPMENT SIZE: TYPE OF CONSTRUCTION: Ron Luslag JR Rose Development LLC [] WET (October I through April 30) ~1 DRY (May I through September 30) 4424 Acres Residential 48 Unil Townhome Developmenl SECTION !1 - RESULTS OF INSPECTION Erosion Control Practices I. Axe erosion controls being implemented and mmnlained on inactive and acUve distmbed soft areas (shcetmg, mulck hay, soil stabili,ers, crc ). m accordance with Erosion and Sediment Control Plans (ESCPs) and provisions of ~the Grading Ordinance7 2 Erosion observed? Sediment Control Praetiees Tracking Controls 5 Axe the entrances and exits to the cottslruct~on site adequately protected (lire washout, smbihzed entrance~, rumble strips)? 6 Axe roads free of sediment? Waste and Disposal Management 7 Axe actiwt~es such ~s con~etc/plastcring, painting and fueling resulting in a discharge to the storm drain in violation of provisions of the Water Quali~y Ordinance? ffYES, des°abe thc evidence oftbe discharge and whelher it is major or minor. 8 Are containers for construction waste and debris being utilized and are they adequate? 9 Axe there potential water qualiiy problems flint have been idenhfied on the site, which may be in moL, Ilion of provisions of the Water Qualfiy Ordinance and I matenals, wlnch may be in violation of promsions of the Water Qualiiy Health" form. Commeats Conunents Con~nents SECTION HI - ENFORCEMENT ACTIONS PRIVATE CONSTRUCTION PROJECTS [2.1 Issued a Notice of Non-Compliance [] Issued an Administrative Compliance Order NOTES: