Loading...
RC Townhomes-CR050430SITE INSPECTION CHECKLIST FOR TOWNHOMES OF COPPELL 400 MACARTHUR DRIVE COPPELL, TX 76019 SECTIONI-GENERAL Inspections shall be performed once every 2 weel~ and within 24 htmrs after a storm event of 0.5 inches or more. Alternatively, inspections may be performed every 7 days without addmonal inspecttons after ram event.s. PROJECT ADDRESS/TRACT: 400 S. MacArthur Bird, Coppcll, Tex,~s 75019 SITE REPRESENTATIVE: Ron Lusi/g DEVELOPER NAME: JR Rose Development LLC DATE OF INSPECTION: ,,~ t ~~ I;5 'WEATHER CONDITION: £; I e a SEASON: ~r'WET (October 1 through April 30) 1~ DRY (May I through September 30) DEVELOPMENT SIZE: 4.424 Acres TYPE OF CONSTRUCTION: ResMential 48 Unit Townhome Developmeat SECTION H - RESULTS OF INSPECTION Erosion Control Practice~ I Are erosion conttols being implemented and matntained on inactive and active thstue00 soil areas (sheeung. mulch, hay, soil smbil~ers, etc ), in accordance with Erosion and Sediment Control Plans (ESCPs) and provisiol~ of the Gradml~ Ordinance? If YES. describe the evidence of the erosion and whether il is rmajo r or tmnor Sediment Control Practices 3 Are so:hmcat controls being hnplemented and maintained on all significant slopes (silt fences, fiber rolls, etc. at the base of.slopes) and the downstream ~erimetar. in accordance with Erosion and Scthmenl Coat roi Plans (ESCPs) and ~ro,asions of the Grading Ordinance? If YES. describe the evidence of the discharge and whether il is major or minor If the discharge could impact wildlife, sensmve habitat/endangered species, an impared water Ixxly (303d listed), ESA or ASBS area, go Io the "Evahiation of I to Human or Environmental Health~ form ) Tracking Controls 5 Are the entrances and exfls to the construction site adequately protected (lire washou~ stobilLTxxl entrances 6 Are roads ffcc of sedmaent? Waste and Disposal Management 7 Are activities such as concrcte/ptashiring, Painting mad fueling rcsaltmg in a discharge to the storm dram in violation of provisions of the Water Quality Ordtnance? If YES, describe the evidence of the discharge and whcther it is major or minor 8 Are containers for construction waste and debris being utilized and are they adequate? 9 Are there potential water quality problems that have been identified on the site, which may be in violation of provisions of the Water Quahty Ordlmance and may require further inspection by an Authorized Water Quality Ordinance ~fs~_or'~ 0 Are there any discharges or spills of sewage, oil. or toxicflmzardous ~tenals. which may be in violation of pmV~sions of the Water Quality rdinace? If YES. go to the "Evaluation of Potential Impacts to Human or Environmental Hffealth' form Comments Comments SECTION IH - ENFORCEMENT ACTIONS PRIVATE CONSTRUCTION PROJECTS Issued a No~ce of Non-Compliance [] Issued an Administrative Compliance Order [] Issued a Cease and Desast Order [] Issued a Stop Work Order NO Action Reqmred ~'~ Request Inspection by an Aathotized Wa cr Quality Ordinance Inspector [~ Other (Please Explain): NOTES: