Loading...
RC Townhomes-CR050515SITE INSPECTION CHECKLIST FOR TOWNHOMES OF COPPELL 400 MACARTHUR DRIVE COPPELL, TX 76019 SECTION I - GENERAL ] lnspectmm' shall be performed once ever). 2 weel~ aim within 24 hour,*' after a storm event qf 0.5 inches or more. Alternatively, inspectior s may be performed eveO, 7 dcO,s without additional inspectums afier ram evenls' PROJECT ADD~SS~CT: 400 S. ~ Blvd., Cop~ll Te~ 75019 . SITE ~P~S~TA~VE: Ron Lus~g DEVELOPER NAME: IR R~ ~el~mmt LLC DA~ OF INSPEC~ON ~ ~ ~A~R CONDITION: SEASON: ~ WET{Ooto~r 1 ~rou~ April 30) ~DRY (May 1 ~ough ~pt~m~r 30) DE~LOP~ SIZE: 4424 Acres ~E OF CONS~UCTION: RemdenBffi 48 uml Tomhome ~elopmem SECTION H - RESULTS OF INSPECTION Erosion Control Practices Y ] N N/A Conunents 1 Are erosion controls being implemented and mmnlained on inactive and active disturbed soil areas (sheeting. mulch, hay, soil stabilizers, cie.), in accordance wilh Erosion and Sediment Control Plans (ESCPs) and provisions of ~e__Grad~nl~ Ordinance? 2 Erosion observed¢ If YES, describe the exqdence of the erosion and whether it is major or minor. Sediment Control Prat~ti~ ~- N N/A --Comments 3 A~e sedamenl controls being implcmenled and mathtmned on all signdicanl / slopes (silt fences, fiber mils, etc. at thc base of slopes) and the downstream pefimeler, ill accordance with Erosion and Sedimen! Collliol Plans (ESCPs) and provisiorm of the Grading Ordinance7 Tracking Controls .... '-Y-- -~ --N/A Comments wa_s_houk stabili~l enLrances, ramble strip~)'! Waste and Disposal M_nnagement Y S N/A Co~m,~en-i;-- 7 Are ac Vltles s~Vas concrelc/plaste~ing, Pmnling and fueling resuth~ SECTION IH- ENFORCEMENT ACTIONS PRIVATE CONSTRUCTION PROJECTS [] Issued a Nonce of Non4~'ompliance lss~ed an Admthistralivc Compliance Order [] Issued a Cease and Desist Order Issued a Stop Work Order ~)~No Action Required Request Inspection by an Authorized Wa er Quatiiy Ordinance inspector ~l Other (Please Explain): NOTES: