Loading...
RC Townhomes-CS050607 (2)Tuesday June 07, 2005 Keith Marvin, P.E. Civil Engineer 255 Parkway Blvd. P.O. Box 9478 Coppell, 'ITK 75019 (972) 304-3570 fax KMARVIN @CI.COPPELL.TX.US Dear Mr. Marvin: This letter is to address the maintenance bond requirements: Paving Amount -$96,500 Stamped Concrete -$3,250 Soil Stabilization -$15,232 Excavation of Roadway -$9,275 Total -$124,257 Amount of bond required =$62,128.50 Erosion Control: Silt Fence -$1,250 Erosion Matting -$720.45 Amount of Escrow (100%) =$1,970.45 Upon f'mal acceptance of the subchvision both bond & escrow check will be submitted. Please follow up and verify, that this meets your requirements. Respectfully A Jason R. Ros/~, ~4n'hitect TX # 1834 ! member .JR/jr PC: Master File 3'e~wta~ Enc: NA _IHRH, lack M. Crow~ey ~ $17-462-3&24 [] www.hr~.com j~ck.crowley~h~h.corn I STATE OF 'r~.x ~ COUN~ O~ DALLAS ]~N~OW ~ ~ BY '~ Plt~l~N~ ~T Coppell To,homes, L.L.C. ~ P~, Developers Surety and I~ty C~pany , a ~ ~ ~-~Y ~ ~ ~ ~o ~ ~ ~ ~ m p~ ,~to ~ e~ous~d ~ 00/100 ~ (~ 50,000.00 Corse ~_ ~o~nhomns L.L.C. Malnr~a~ce Bond P~e 1 o~ Ext}eme EnVironmental, Inc. · Atto:' Jason Hall P.O. Box 496927 Garland, Texas 75049-6927 (214)869-9622 Invoice DATE INVOICE # 9/9/2004 2272~i j R Ros~ Develop~men~ Vendor # ] REP ~ 005 Description Townhomes of Coppe Construction Entrance ;ilt fence wNVire Backing Terms Due on receipt Qty 200 ft Rate Amount 1,000.00 1,000.00 1.25 250.00 Thank-you for your business! i Total $~,250.001 PEEBLES fi. ASSOCIATES CIVIL ENGINEERS/LAND SURVEYORS 1321 Broum Trail · Suite C · Bedford,, Texas 76022 · 817-662-0118 · Fax817-662-0123 May 11, 2005 City Of Coppell Engineering Department 225 Parkway Blvd. Coppell, Texas 75019 RE: Paving Riverchas¢ Townhmes Gentlemen; This letter is to confirm that we have checked both location and elevations and found them in conformity to the latest plans on paving for the above referenced site. Should you have any questions concerning this please feel free to call on us. PEEBLE$ & ASSOCIATES CIVIL ENGINEERS/LAND SURVEYORS 1321 Brown TruiI · Suite O · Bedford, Texas 76022 · 817-662-0118 · Fax817-662-0123 May 11, 2005 City Of Coppell Engineering Department 225 Parkway Blvd. Coppell, Texas 75019 RE: Pad Elevation Riverchase Townhmes Gentlemen; This letter is to confirm that we have checked elevations and found them in conformity to the latest plans on grading for the above referenced site. Should you have any questions concerning this please feel free to call on us. Sin~¢l~ ~, JR RHODES DEVELOPMENT 410SPINNAKER DR. ALLEN, TX 75013 214-454-7895 (JASON) JOB NAME: TOWNHOMES OF COPPELL JOB NUMBER: 05041 NORTH TEXAS BOMANITE, INC. INVOICE APRIL 29, 2005 ORIGINAL CONTRACT: $3,250.00 CHANGE ORDERS: TOTAL: $3,250.00 PERCENT COMPLETE: I00.00% PAY REQUEST #: 1 FROM MAR 18, 2005 TO APR 30, 2005 I CONTRACT ' Bomanite colored, stamped concrete entry sidewalk. 1,00 1.00 $3,250.00 $3,250.00 $3,250.00 EXTRA WORK~CHANGE ORDERS TOTAL AMOUNT OF WORK PERFORMED LESS RETAINAGE NET AMOUNT PAYABLE ON CONTRACT LESS: SPECIAL DEDUCTIONS PLUS: OTHER NET AMOUNT DUE ON PROJECT LESS PAYMENTS RECEIVED TO DATE CURRENT AMOUNT DUE ON PROJECT AMOUNTS UNPAID FROM PRIOR INVOICE(S) AMOUNTS DUE FROM CURRENT INVOICE CURRENT AMOUNT DUE NORTH TEXAS BOMANITE $3,250.00 $3,250.00 $3,250.00 ! $3,250.00 $3,250.00 $3,25O.0O $3,250.00J $3,259.0~1 11107 MORRISON LANE * DALLAS, TEXAS 75229-5608 * 972-484-8465 * 972-484-8466 FAX TARDEN CONCRETE INC. PROPOSAL 1/04/04 JR ROSE DEVELOPMENT 410 SPINNAKER DRIVE ALLEN, TX 75011 ATTN: JASON ROSE PHONE: 214-454-7895 FAX: 972-420-0324 REF: TOWNHOMES OF COPPELL WE HEREBY PROPOSE TO FURNISH THE LABOR, MATERIAL AND EQLIIPTMENT AS NOTED FOR THE COMPLETION OF THE WORK SPECIFIED HEREIN PER PLANS AND SPECIFICATIONS SUBMITTED. QUANTITIES FOR THIS BID ARE BASED ON PLANS BY: DRAWINGS: ARCHITECTURAL STRLICTHRAL CIVIL SPECIFICATIONS: PER CITY OF COPPELL. THIS PROPOSAL WILL BE ACCEPTABLE FOR THE TttlRTY (30) DAYS UNLESS OTEIERWISE AGREED UPON. THANK YOU FOR THE OPPORTUNITY TO BID THIS PROIECT. MARK IDEN 2500 HIGHWAY 121, SU1TE 1515 EULESS, TX 76039 PHONE: 214.235.7127 FAX: 817.399.0196 Tarden63 @hotmail.com TARDEN CONCRETE INC. SCOPE OF WORK INCLUDED: Demolilion Pa~4ng slipform machine Paving hand laved 435 si' 22,960 st' 15,150 st' Total: 38,110 sf Note: All Paving Concrete figured at 3000 PSI. on slipform. All Paving Concrete figured at 360 PSI. on hand laved Excludes any rock excavation. Paving 38,110 Sq. Ft. TOTAL BID: $96,500. O0 Note: price does not include tax ,maintenance bond or performance bond. THE FOLLOWING ARE SPECIFICALLY INCLUDED FOR THE ABOVE · Batter boards, forms and accessories · Reinforcement and accessories · Slipform Machine · Saw crdttmg, demolition and haul off' of existing concTete · Backfill curbs THE FOLLOWING ARE SPECIFICALLY EXCLUDED FOR THE ABOVE · Fibermesh · Exposed A~regate · Dirt Work (sub grade to be + or - 1 / 1 O) · Soil erosion protection · Excavation or drilling of rock if encountered · Dewatering as a result of subsurface water · Piers · Surveying, engineering, layout building comers, back ofcx~rbs, and blue tops by others. · Stamped, colored, patterned or grooved concrete · Paver's · Concrete temperature control (heating or ice, etc.) · Masonry reinforcing · Sawed control joints at foundation 2500 HIGHWAY 12i, SUITE 1515 EULESS, TX 76039 PIIONE: 214.235.7127 FAX: 817.399.0196 Tarden63 ~photmail.com TARDEN CONCRETE INC. · Embedded materials (anchor bolts, pipe bollards, embedded plates, angles, hold downs, etc.) except as noted · Testing by labs · Permits or fees · Performance or payment bonds · Wet curing · Hardness or sealers · Drawings for anchor bolt layout · Removal of trash or concrete spoils form site (we will place in dumpster or designated area) · Spoil removal off site · Backfdl with select filI (offsite material) · Soil poisoning · PVC for electrical or landscaping sleeves · Sweeping or washing down pavement · Inlets, drains, catch basins, box culverts · Stair nosing or sleeves for rails · Grouting of thresholds · Safety railings or perimeter cables at upper floors, pits, drops, and openings · Light weight concrete-furnish or install · Pool decks, mechanical pads or site retaining walls · Any item not on the Bid Schedule Alternates Notes If retainage is held, it is to be funded 30 days after completion of each phase of our work. Proposal to become part of contract All mater/al price only good for thirty (30) days alter that time any increase in price will be paid by contractor or owner including sales tax and markup. 2500 HIGHWAY 121, SUITE 1515 EULESS, 'PX 76039 PHONE: 214.235.7127 F^X: 817.399.0196 Tarden63 (~a)hotmail. eom ECIALTIES, INC. Re: 'I ownhomes of Coppell - J.R Rose Development [nc. To Whom ft May Concern: Base Contract for Excavation - $ 33,800.00 Base Contract for Soil Stabilization - 5/14,742.00 + Tax $ 490.00 Excavanon of Roadway - $ 9,275.00 Sincerely, Ward L McAfee Office 817-270,-~0~8 l~ax 817-270~$058 P.O. Box 670 Azle, TX, 76098