RC Townhomes-CS050607 (2)Tuesday June 07, 2005
Keith Marvin, P.E.
Civil Engineer
255 Parkway Blvd.
P.O. Box 9478
Coppell, 'ITK 75019
(972) 304-3570 fax
KMARVIN @CI.COPPELL.TX.US
Dear Mr. Marvin:
This letter is to address the maintenance bond requirements:
Paving Amount -$96,500
Stamped Concrete -$3,250
Soil Stabilization -$15,232
Excavation of Roadway -$9,275
Total -$124,257
Amount of bond required =$62,128.50
Erosion Control:
Silt Fence -$1,250
Erosion Matting -$720.45
Amount of Escrow (100%) =$1,970.45
Upon f'mal acceptance of the subchvision both bond & escrow check will be submitted. Please follow
up and verify, that this meets your requirements.
Respectfully A
Jason R. Ros/~, ~4n'hitect TX # 1834 !
member
.JR/jr
PC: Master File
3'e~wta~
Enc: NA
_IHRH,
lack M. Crow~ey
~ $17-462-3&24
[] www.hr~.com
j~ck.crowley~h~h.corn
I
STATE OF 'r~.x ~
COUN~ O~ DALLAS
]~N~OW ~ ~ BY '~ Plt~l~N~ ~T Coppell To,homes,
L.L.C.
~ P~,
Developers Surety and I~ty C~pany , a ~ ~
~-~Y ~ ~ ~ ~o ~ ~ ~ ~ m p~ ,~to ~
e~ous~d ~ 00/100
~ (~ 50,000.00
Corse ~_ ~o~nhomns L.L.C.
Malnr~a~ce Bond
P~e 1 o~
Ext}eme EnVironmental, Inc.
· Atto:' Jason Hall
P.O. Box 496927
Garland, Texas 75049-6927
(214)869-9622
Invoice
DATE INVOICE #
9/9/2004 2272~i
j R Ros~ Develop~men~
Vendor # ]
REP ~ 005
Description
Townhomes of Coppe
Construction Entrance
;ilt fence wNVire Backing
Terms
Due on receipt
Qty
200 ft
Rate
Amount
1,000.00 1,000.00
1.25 250.00
Thank-you for your business!
i Total
$~,250.001
PEEBLES fi. ASSOCIATES CIVIL ENGINEERS/LAND SURVEYORS
1321 Broum Trail · Suite C · Bedford,, Texas 76022 · 817-662-0118 · Fax817-662-0123
May 11, 2005
City Of Coppell
Engineering Department
225 Parkway Blvd.
Coppell, Texas 75019
RE: Paving
Riverchas¢ Townhmes
Gentlemen;
This letter is to confirm that we have checked both location and elevations and found them in
conformity to the latest plans on paving for the above referenced site.
Should you have any questions concerning this please feel free to call on us.
PEEBLE$ & ASSOCIATES CIVIL ENGINEERS/LAND SURVEYORS
1321 Brown TruiI · Suite O · Bedford, Texas 76022 · 817-662-0118 · Fax817-662-0123
May 11, 2005
City Of Coppell
Engineering Department
225 Parkway Blvd.
Coppell, Texas 75019
RE: Pad Elevation
Riverchase Townhmes
Gentlemen;
This letter is to confirm that we have checked elevations and found them in conformity to the
latest plans on grading for the above referenced site.
Should you have any questions concerning this please feel free to call on us.
Sin~¢l~ ~,
JR RHODES DEVELOPMENT
410SPINNAKER DR.
ALLEN, TX 75013
214-454-7895 (JASON)
JOB NAME: TOWNHOMES OF COPPELL
JOB NUMBER: 05041
NORTH TEXAS BOMANITE, INC.
INVOICE
APRIL 29, 2005
ORIGINAL CONTRACT: $3,250.00
CHANGE ORDERS:
TOTAL: $3,250.00
PERCENT COMPLETE: I00.00%
PAY REQUEST #: 1
FROM MAR 18, 2005 TO APR 30, 2005
I CONTRACT
' Bomanite colored, stamped concrete
entry sidewalk.
1,00
1.00
$3,250.00
$3,250.00
$3,250.00
EXTRA WORK~CHANGE ORDERS
TOTAL AMOUNT OF WORK PERFORMED
LESS RETAINAGE
NET AMOUNT PAYABLE ON CONTRACT
LESS: SPECIAL DEDUCTIONS
PLUS: OTHER
NET AMOUNT DUE ON PROJECT
LESS PAYMENTS RECEIVED TO DATE
CURRENT AMOUNT DUE ON PROJECT
AMOUNTS UNPAID FROM PRIOR INVOICE(S)
AMOUNTS DUE FROM CURRENT INVOICE
CURRENT AMOUNT DUE NORTH TEXAS BOMANITE
$3,250.00 $3,250.00
$3,250.00 ! $3,250.00
$3,250.00
$3,25O.0O
$3,250.00J
$3,259.0~1
11107 MORRISON LANE * DALLAS, TEXAS 75229-5608 * 972-484-8465 * 972-484-8466 FAX
TARDEN CONCRETE INC.
PROPOSAL
1/04/04
JR ROSE DEVELOPMENT
410 SPINNAKER DRIVE
ALLEN, TX 75011
ATTN: JASON ROSE
PHONE: 214-454-7895
FAX: 972-420-0324
REF:
TOWNHOMES OF COPPELL
WE HEREBY PROPOSE TO FURNISH THE LABOR, MATERIAL AND EQLIIPTMENT AS NOTED FOR THE COMPLETION OF THE WORK
SPECIFIED HEREIN PER PLANS AND SPECIFICATIONS SUBMITTED. QUANTITIES FOR THIS BID ARE BASED ON PLANS BY:
DRAWINGS:
ARCHITECTURAL
STRLICTHRAL
CIVIL
SPECIFICATIONS: PER CITY OF COPPELL.
THIS PROPOSAL WILL BE ACCEPTABLE FOR THE TttlRTY (30) DAYS UNLESS OTEIERWISE AGREED UPON. THANK YOU FOR THE
OPPORTUNITY TO BID THIS PROIECT.
MARK IDEN
2500 HIGHWAY 121, SU1TE 1515
EULESS, TX 76039
PHONE: 214.235.7127 FAX: 817.399.0196
Tarden63 @hotmail.com
TARDEN CONCRETE INC.
SCOPE OF WORK INCLUDED:
Demolilion
Pa~4ng slipform machine
Paving hand laved
435 si'
22,960 st'
15,150 st'
Total: 38,110 sf
Note:
All Paving Concrete figured at 3000 PSI. on slipform.
All Paving Concrete figured at 360 PSI. on hand laved
Excludes any rock excavation.
Paving 38,110 Sq. Ft.
TOTAL BID: $96,500. O0
Note: price does not include tax ,maintenance bond or performance bond.
THE FOLLOWING ARE SPECIFICALLY INCLUDED FOR THE ABOVE
· Batter boards, forms and accessories
· Reinforcement and accessories
· Slipform Machine
· Saw crdttmg, demolition and haul off' of existing concTete
· Backfill curbs
THE FOLLOWING ARE SPECIFICALLY EXCLUDED FOR THE ABOVE
· Fibermesh
· Exposed A~regate
· Dirt Work (sub grade to be + or - 1 / 1 O)
· Soil erosion protection
· Excavation or drilling of rock if encountered
· Dewatering as a result of subsurface water
· Piers
· Surveying, engineering, layout building comers, back ofcx~rbs, and blue tops by others.
· Stamped, colored, patterned or grooved concrete
· Paver's
· Concrete temperature control (heating or ice, etc.)
· Masonry reinforcing
· Sawed control joints at foundation
2500 HIGHWAY 12i, SUITE 1515
EULESS, TX 76039
PIIONE: 214.235.7127 FAX: 817.399.0196
Tarden63 ~photmail.com
TARDEN CONCRETE INC.
· Embedded materials (anchor bolts, pipe bollards, embedded plates, angles, hold downs, etc.) except as noted
· Testing by labs
· Permits or fees
· Performance or payment bonds
· Wet curing
· Hardness or sealers
· Drawings for anchor bolt layout
· Removal of trash or concrete spoils form site (we will place in dumpster or designated area)
· Spoil removal off site
· Backfdl with select filI (offsite material)
· Soil poisoning
· PVC for electrical or landscaping sleeves
· Sweeping or washing down pavement
· Inlets, drains, catch basins, box culverts
· Stair nosing or sleeves for rails
· Grouting of thresholds
· Safety railings or perimeter cables at upper floors, pits, drops, and openings
· Light weight concrete-furnish or install
· Pool decks, mechanical pads or site retaining walls
· Any item not on the Bid Schedule
Alternates
Notes
If retainage is held, it is to be funded 30 days after completion of each phase of our work.
Proposal to become part of contract
All mater/al price only good for thirty (30) days alter that time any increase in price will be paid by
contractor or owner including sales tax and markup.
2500 HIGHWAY 121, SUITE 1515
EULESS, 'PX 76039
PHONE: 214.235.7127 F^X: 817.399.0196
Tarden63 (~a)hotmail. eom
ECIALTIES, INC.
Re: 'I ownhomes of Coppell - J.R Rose Development [nc.
To Whom ft May Concern:
Base Contract for Excavation - $ 33,800.00
Base Contract for Soil Stabilization - 5/14,742.00 + Tax $ 490.00
Excavanon of Roadway - $ 9,275.00
Sincerely,
Ward L McAfee
Office 817-270,-~0~8 l~ax 817-270~$058