MA0405-CS050609From: To: Date: Subject: Keith Marvin Brick Paver 6/9/2005 8:57:51 AM Brick Paver Replacement Project All, I am sending this email at the request of Deputy Chief Tim Oates to update you on a project that is currently underway on MacArthur Boulevard. The project is to replace the bands of brick pavers at most of the intersections along MacArthur from Riverchase drive to Samuel Boulevard. During the March 8, 2005 City Council meeting the Engineering Department requested, and was granted, permission to close one lane in each direction along MacArthur Blvd. for the completion of this project. Therefore for the duration of the project you may find MacArthur restricted to one lane in various locations. The project is expected to be completed prior to the start of the school year on August 15, 2005. in addition to the lane closures along MacArthur, the following side streets will be impacted: Riverchase Drive - Portions of the street will be blocked during construction, however the intent is to maintain two way traffic at all times. Bethel School Road - During construction at this intersection the street will be closed to all traffic for a period of appi:oximately three weeks. All traffic will be directed to Condor Drive as an alternate route. Condor Drive - During construction at this intersection the street will be closed to all traffic for a period of approximately three weeks. All traffic will be directed to Bethel School Road as an alternate route. The intersections of Bethel School and Condor Drive will not be closed at the same time. Village Parkway South - During construction at this intersection the street will be closed to all traffic for a period of approximately three weeks. All traffic will be directed to Village Parkway North as an alternate route. Parkway Boulevard - Portions of the street will be blocked during construction, however the intent is to maintain two way traffic at all times. Village Parkway North - During construction at this intersection the street will be closed to all traffic for a period of approximately three weeks. All traffic will be directed to Village Parkway South as an alternate route. The intersections of Village Parkway North and Village Parkway South will not be closed at the same time. Samuel Boulevard - Portions of the street will be blocked during construction, however the intent is to maintain two way traffic at all times. Village (across from Samuel) - During construction at this intersection the street will be closed to all traffic for a period of approximately three weeks. All traffic will be directed to Lake Forest or Deforest as an alternate route. I will notify you in advance of any future restrictions and or closures at these intersections, as well as notify you when the restrictions have been lifted. Currently Village Parkway South, and Village (across from Samuel) are closed to ail traffic. Portions of Samuel are blocked, however two way access is provided. The contractor has informed us that Parkway will be restricted beginning on Friday, Condor will be closed on Monday, and the other half of the driveway at Station Two will be closed on Wednesday. If you need any additional information, please feel free to call Rick O'Dell, the inspector for the project, or myself. Keith R. Marvin, P.E. City of Coppell (972) 304-7044 kmarvin@ci.coppell.tx.us Griffin, Ken; Taylor, Suzan