Loading...
Coppell Trade-LR050607REPORT OF REINFORCING STEEL OBSERVATION 'lg rracan 8901 Cerpenter Fnny., Suite #1 (30 Dallas, Texas 75247 Date of Service: Client No.: Client: 06/07/05 93345 Coppell Trade Center LP 5055 Keller Springs Rd Ste 300 Addison, TX 75001 Report No.: Project No.: Project: 94051190.0023 94051190 Coppell Trade Center - Bldg C NWC Sandy Lake/Freeport Pkwy Coppell, TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Sheets 2 & 3 of 16, Fire Lane Detail/Paving Plan, dated 11/01/04 Locations/Items Observed: See attached sketch of 190' by 115' area of combined Track Dock, Fire Lane and Slab-on-Grade, W side of Building C Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise noted. NOTE: Fire Lane is 7 inches thick and Dock Area is 6 inches thick in lieu of lime. Field Results Report To: Technician: M. Odom Report Distribution: (1) Coppell Trade Center LP (1) TechniStructurBs (1) City of Coppell TX (1) C~ty of Coppefl TX 309sks Henry w/McFadden & Miller 'lrerracon (1) McFadden & Miller (1) Macatee Engineering Inc . Robert D. Ray,~.T. Senior Proj~/~felanager HBC / TERRACON REPORT NO. ?~o5'/190, oo ~s CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051190.0012 Service Date: May 27, 2005 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Coppell Trade Center LP Attn: Al Sorrels 5055 Keller Springs Rd Ste 300 Addison TX 75001 Report Date: June 07, 2005 Project: Coppell Trade Center- BIdg C NWC Sandy Lake/Freeport Pkwy Coppell, TX Project Number: 94051190 Material Information Specified Strength: 4000 psi @ 28 Days Batch Time: 5:54am Plant: 141 Supplier: TXI Truck No: 64 Mix I.D. No.: 8206 Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Result Slump, inches: 6.00 Air Content, %: 5.5 Concrete Temperature, o F: 88 Ambient Temperature, o F: 71 Plastic Unit Weight, pcf: 142.8 Laboratory Test Data Ticket No: 53370 Sample Information sample Time: 6:22am Date Cast: May 27, 2005 Technician: Bradley W. Hatch Weather Conditions: Cloudy Accumulative Yards: 40 Placement Method: Direct Discharge Sample Locations: 20' S & 140' W of NW corner of building Placement Location: Pavement, 0' - 250' S & 20' - 160' W of NW corner of bldg Specification Set Specimen Diameter Area Date No. ID (inches) (sq. inches) Tested 1 1 6.00 26.27 06/03/2005 1 2 6.00 28.27 06/03/2005 1 3 06/24/2005 1 4 06/24/2005 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 102,170 3,610 ~ 7 10? ~o 3 Average 3,630 28 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company, Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Page 1 of 4 ~' Et~°I FL~ure~eY CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051190.0012 Service Date: May 27, 2005 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Coppell Trade Center LP Attn: Al Sorrels 5055 Keller Springs Rd Ste 300 Addison TX 75001 Report Date: June 07, 2005 Project: Coppell Trade Center - Bldg C NWC Sandy Lake/Freeport Pkwy Coppell, TX Project Number: 94051190 Material Information Specified Strength: 4000 psi @ 28 Days Plant: 141 Ticket No: 53435 0 Gallons 0 Gallons Batch Time: 6:43am Supplier: TXI Truck No: 71 Mix I.D. No.: 8206 Water Added Onsite Before Test: Water Added Onsite After Test: Field Test Data Sample Information Sample Time: 7:12am Date Cast: May 27, 2005 Technician: Bradley W. Hatch Weather Conditions: Cloudy Accumulative Yards: 110 Placement Method: Direct Discharge Sample Locations: 160' S & 30' W of NW corner of building Placement Location: See page 1 Test Result Specification Test Method Slump, inches: 5.00 ASTM C143 Air Content, %: 5.7 ASTM C231 Concrete Temperature,° F: 87 ASTM C1064 Ambient Temperature, o F: 73 ASTM C1064 Plastic Unit Weight, pcf: 142.8 ASTM C138 Laborator~ Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No~ ID (inches) (sq. inches) Tested (days) (lbs) (psi) D-' ! 2 1 6.00 28.27 06/03/2005 110,720 3,920 ~i~ 2 2 6.00 28.27 06/03/2005 ( 7 107,010 3~ '~ Average 2 3 06/24/2005 28 2 4 06/24/2005 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusivety for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051190.0012 Service Date: May 27, 2005 'll'erracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Coppell Trade Center LP Attn: A] Sorrels 5055 Keller Springs Rd Ste 300 Addison TX 75001 Report Date: June 07, 2005 Project: Coppell Trade Center- Bldg C NWC Sandy Lake/Freeport Pkwy Coppell, TX Project Number: 94051190 Ma terial Information Specified Strength: 4000 psi ~ 28 Days Batch Time: 7:54am Supplier: TXI Truck No: 802 Mix I.D. No.: 8206 Water Added Onsite Before Test: Water Added Onsite After Test: Field Test Data Plant: 141 Ticket No: 53534 0 Gallons 0 Gallons Sample Information Sample Time: 8:26am Date Cast: May 27, 2005 Technician: Bradley W. Hatch Weather Conditions: Cloudy Accumulative Yards: 210 Placement Method: Direct Discharge Sample Locations: 195' S & 130' W of NW corner of building Placement Location: See page 1 Test Result Specification Test Method Slump, inches: 5.25 ASTM C143 Air Content, %: 4.9 ASTM C231 Concrete Temperature, o F: 88 ASTM Cl 064 Ambient Temperature, o F: 75 ASTM C1064 Plastic Unit Weight, pcf: 144.4 ASTM Cl 38 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq, inches) Tested (days) (lbs) (psi) 3 1 6.00 28.27 06/03/2005 7 119,680 ~ 4,230 3 2 6.00 28.27 06/03/2005 7 116,930 Average 4,f 90 3 3 06/24/2005 28 3 4 06/24/2005 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This repor~ is exclusively for the use of the client indicated above and shall not be reproduced except in tull without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051190.0012 Service Date: May 27, 2005 ll'erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Coppell Trade Center LP Attn: Al Sorrels 5055 Keller Springs Rd Ste 300 Addison TX 75001 Report Date: June 07, 2005 Project: Coppell Trade Center- Bldg C NWC Sandy Lake/Freeporf Pkwy Coppell, TX Project Number: 94051190 Material Information Specified Strength: 4000 psi (~ 28 Days Batch Time: 9:25am Plant: 141 Supplier: TXI Truck No: 62 Mix I.D. No.: 8206 Water Added Onsite Before Test: 0 Gallons WaterAdded Onsite After Test: 5 Gallons Field Test Data Test Result Slump, inches: 5.00 Air Content, %: 5.7 Concrete Temperature, o F: 91 Ambient Temperature, o F: 78 Plastic Unit Weight, pcf: 143.6 Laboratory Test Data Ticket No: 53661 Sample Information Sample Time: 9:55am Date Cast: May 27, 2005 Technician: Bradley W. Hatch Weather Conditions: Cloudy Accumulative Yards: 320 Placement Method: Direct Discharge Sampre Locations: 230' S & 75' W of NW corner of building Placement Location: See page 1 Specification Test Method Set Specimen Diameter Area Date No. ID (inches) (sq. inches) Tested 4 1 6.00 28.27 06/03/2005 4 2 6.00 28.27 06/03/2005 ASTM C143 ASTM C231 ASTM C1064 ASTM Cl 064 ASTM C138 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 114,150 ve;al;~420 4 3 06/24/2005 28 4 4 06/24/2005 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Bradley W. Hatch Report Distribution: (1) Coppell Trade Center LP (1) TechniStructures (1) City of Coppell TX (1) City ef Coppell TX (1) McFadden & Miller Reviewed by: (1) Macatee Engineering lac The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 4 of 4