Loading...
Coppell Trade-CS050608June 8, 2005 Coppell Trade Center, LP 5055 Keller Spring Rd., Ste 300 Addison, TX 750~~~'''~ Attn: ~rells Re: Coppell Trade Center Building C HBC/Terracon Project No. 94051190.0026 'li'erracan Consulting Engineers & Scientists 8901 Carpenter Frwy, Suite 100 Dallas, Texas 75247 Phone 214.630.1010 Fax 214.630.7070 www.terracon.com Dear Mr. Sorrells, Based on discussions during the preconstruction meeting concerning our recommendation for the spread footing subgrade preparation, it is acceptable to install the spread footings directly on top of a two foot thick layer of flexible base as long as the flexible base and the subgrade directly below the flexible base has 95% minimum compaction. In-place field density tests can verify the compaction of the subgrade at this elevation. During the moisture conditioning phase of the building pad, the required compaction of the soil at this depth was to be a minimum of 93% at these locations. Our original recommendations stated that the bottom of the flexible base needs to extend through the moisture conditioned zone of the building pad, with a minimum thickness of 2 feet. In some cases where the footings will be only 12 inches thick, this would require the flexible base to be 2~ feet thick. This can be reduced to a 2 feet thick layer as long as the required compaction, as stated above, has been met. Please feel free to call with any questions regarding this project. We appreciate the opportunity to provide these services. Respectfully, Robert D. Ray SETUp,-,'/ Sr. Project Manager cc: Distribution Delivering Success for Clients and Employees Since 1965 More Than 60 Offices Nationwide REPORT OF FOOTING EXCAVATION DEPTH VERIFICATION lrerracan Dallas, Texas 75247 Date of Service: 05/] 8/05 Report No.: CLient No.: 93345 Project No.: Client: CoppelJ Trade CenterL~, ~ Project: 5055 Keller Springs E/Stel31~l . Addison, TX 75001 ~/~t[~'~ Services: 94051190.0003 94051190 Coppell Trade Center - Bldg C NWC Sandy Lake/'Freeport Pkwy Coppell, TX Terracon's technician was requested to verify depth of footing excavation below finished pad grade. TEST FOOTING LOCATI/ "~. DEPTH/ELEVATION NO. ~OF FOOTING 1 E/24 l~lexible base in place 2 E/23 Fh dble base in p ace 3 E/22 FI~ dble base in p ace 4 E/21 5' 0" 5 E/20 5' 4" 6 D/24 4' 8" 7 D/23 5' 0" 8 D/22 4' 9" 9 D/21 4' 10" 10 D/20 [5' 4" 11 C/24~ 5' 0" 12 C/23 4' 8" 13 C/22 4' 8" Comments: Technician: L. Chronister lr'erracan (1) Coppell Trade Center LP (1) Merriman Assoc Inc ~~~ ~,.'"~..~ (1) TechniStructures (1) McFadden & Miller (1) City of Coppell TX (1) Macatee Engineering Inc (1) City of Coppell TX Robert D. Ra~?,~.E.T. Senior Projeof'Manager