Loading...
Sandy Lk Cross 2R-CS050616COP?ELL June 16, 2005 James Dewey, Jr., P.E. JDJR Engineers and Consultants, Inc. 2500 Texas Drive, Suite 100 Irving, TX 75062 RE: Sandy Lake Crossing/Lot 2R, Block 1 Construction Plan Review Comments Dear Mr. Dewey: The City of Coppell has reviewed the revised plans for the referenced addition. These plans meet our current minimum standards. Please submit copies for the City Engineer's stamp. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. If you have any questions, please contact me at your convenience. Sincerely, Charlene La 1Vrattina, E.I.T. Graduate Engineer Office Phone: (972) 304-3681 Fax: (972) 304-7041 cc: Thomas J. Whan, Creekside Construction