Loading...
DR0401-CS050620COPPEE£ June 20, 2005 Kay Keene, President Whitewater Construction, Inc. 6640 Old Mexia Rd. Waco TX 76705 RE: Oakcrest Barrow Ditch Drainage Improvements Project # DR 04-01 Dear Ms. Keene: A pre-construction conference on the referenced project has been scheduled for Wednesday, June 22, 2005 at 10:00 a.m. in the Lobby conference room in Town Center at 255 Parkway Blvd. Please provide the signed contract documents on or before the date of the pre- construction meeting. Also, notify any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me. Garreth Cam~ Construction Inspector Office Phone: 972-304-3685 Fax: 972-304-3570 CCi Keith R. Marvin, P.E. MESSAGE CONF I RMAT I ON 06×20×2005 10:22 ID--CITY OF COPPELL ENGR. DEPT. DATE TIME S~R-TIME DISTANT STATION ID MODE PAGES RESULT 06~20 10:18 00'26" WHITEWATER CALLING 01 OK 0000