RC Townhomes-CS050620C-OPPEL£ June 20, 2005 Jason R. Rose Coppell Townhouses, LLC 410 Spinnaker Drive Allen TX 75013 RE: Riverchase Townhomes Addition Dear Mr. Rose: As a result of the most recent walk-through inspection conducted, I am providing the following list of items that are requirements for the final acceptance of work inspected by the Engineering Dept. 1. Provide all SWPPP reports for the project monthly. 2. All erosion control facilities must be in place and functioning - repair or replace existing facilities as needed. 3. Place sod in affected areas of MacArthur Park / maintain to final growth. 4. Re-grade the flow line of the existing channel where construction of the retaining wall impedes drainage to the east. 5. Grade to drain properly from Lots 2-9 to the inlet. 6. Provide as-built plans. Once these items have been completed, please contact me to schedule a follow-up inspection for final acceptance of the project. Since 1 . . Larry Davis Construction Inspector Office: 972-304-3684 Fax: 972-304-3570 CC: Kenneth M. Griffin, P.E., Director of Engineering & Public Works Keith Marvin, P.E., Civil Engineer Greg Jones, Chief Building Official Lee Stone, Building Inspector Tim Oates, Fire Marshal John Elias, Parks Operations Manager Donald S. Peebles, P.E., Peebles & Associates 255 PARK WAY ~ POBOX 9478 ~ COPPELL tX 75019 ~ TEL 972/462 0022 ~ FAX 972/304 3673