Loading...
ST9905-CS050614T H £ C I T Y 0 F COPPELL June 14,2005 Jim & Carolyn Skinner 604 Loch Lane Coppell, Texas 75019-3907 RE: Bethel Road I ST 99-05 Drainage Easement Dear Mr. & Ms. Skinner: As you are aware, the city intends to reconstruct Bethel Road. The first phase of improvements, Bethel Road I, will extend from the west city limits to just east of Freeport Parkway. The second phase of improvements, Bethel Road II, will extend from east of Freeport Parkway to Denton Tap Road. The city wants to bid the Bethel Road I project in the 4th quarter of 2005 and the Bethel Road II project in the 4th quarter of 2006. As part of the Bethel I project, the consulting engineer prepared a study for the drainage basin (676 acres) above Coppell Road and designed the necessary storm water improvements. The existing stream that starts at Freeport Parkway and extends through your property will be modified. It will be replaced by a 35-foot bottom width, 6-foot deep, gabion basket side slope channel from Freeport Parkway to east of Coppell Road. The stream north of Bethel Road is under the jurisdiction of the U.S. Army Corps of Engineers (USACE). The city has worked with the USACE for over two years to obtain a permit to construct the channel. The first application to the USACE was for an Individual Permit to construct channel improvements from Freeport Parkway to east of Coppell Road. Subsequent to the submittal and at the request of the city, the USACE removed the section of stream from Freeport Parkway to north of Bethel Road from their jurisdiction. This aPowed the city to reduce the scope of the permit and apply for a Nationwide Permit (NWP) which is less restrictive than an Individual Permit. The city then submitted the second application for a NWP to construct channel improvements from Bethel Road to approximately 350 feet northward. The permit was finally approved by the USACE in May 2005. The channel improvements from Bethel Road to 350 feet northward will be constructed with the Bethel Road I project. The city will have to obtain a permit for the remaining portion of the channel and it will be constructed with the Bethel Road II project. The city will need a drainage easement from your property located at 604 Loch Lane in order to construct the channel improvements. In accordance with the NWP, the city is required to mitigate the t;oP~__ttL impacts of the proposed channel modifications and enhance the 2~ PARKYVAy ~- po BOX g478 ~r COppELL_ TX 75019 ,/r TEL 972/46Z 0022 ~k FAX 972/304 3673 functions of the modified channel so that aquatic resources downstream are protected from degradation. The bottom of the modified channel will be planted with native grasses, legumes and wildflowers and the banks will be planted with native trees, shrubs, and native herbaceous species. The easement will have to be deed restricted so that the mitigation area will not be disturbed, except by those activities that would not adversely affect the intended extent, condition and function of the mitigation area. Enclosed is a copy of the easement required for the construction of the improved channel. The city wants to advertise the Bethel Road I project in September 2005 and would like to meet with you to discuss the easement. The City Engineer is out of the office until the first week in July and I will contact you after that time to set up a meeting time. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please advise. Sincerely, Suza(a Taylor CIP C~rdinator Engineering Department Direct: 972-304~7019 Fax: 972-304-3570 E-mail: sta¥1or~,,ci.coppell.tx.us Enclosures