ST9302-LR000607ALPHA TESTING, INC.
22~9 W~sconsin St., Suite ~00
Dallas, Texos 7~22~
~72/620-8~ ~ ~ - ~72/26~-4~$7 CMet~o)
FAX: ~72/406-8023
DALLY FIELD REPORT
TESTED FOR: CITY OF COPPELL
COPPELL, TEXAS
PROJECT:
SANDY LAKE ROAD
PROJECT NO. ST 93-02
COPPELL, TEXAS
DATE: 06/07/00
OUR REPORT NO:
98881-147
TECHNICIAN: K.C.
WEATHER:
TEMPERATURE RANGE:
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING
WORK AND PERFORM FIELD TESTING AS REQUESTED.
THE ALPHA REPRESENTATIVE PERFORMED FIELD OBSERVATIONS OF THE ON-SITE TEMPORARY BATCH
PLANT AT THE SANDY LAKE ROAD AND RIVERCHASE DRIVE LOCATION.
THE ALPHA TECHNICIAN OBSERVED THE CONDITION AND OPERATION OF THE BATCH PLANT. TECHNICIAN
ALSO PERFORMED AIR CONTENT TESTS ON THE CONCRETE MIX TO ASSIST THE CITY REPRESENTATIVE IN
CALIBRATING THE AMOUNT OF AIR ENTRAINING ADMIXTURE USED. (SEE ATTACHED REPORT FOR
REPORTS OF BATCH PLANT OBSERVATIONS.)
AT THE COMPLETION OF THE SCHEDULED OBSERVATIONS, THE TECHNICIAN RETURNED TO THE DALLAS
OFFICE.
CC:
NONE
Geotechnical Engineedng · Construction Materials Testing · Environmental Engineering · Consulting