ST9302-LR000607 (2)ALPHA TESTING, INC.
2209 Wisconsin St,, Suite 100
Dallas, Texas 75229
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/406-8023
TESTED FOR
CITY OF COPPELL
COPPELL, TEXAS
CONCRETE BATCH
PLANT INSPECTION
DATE 6/7/00
PROdECT
SANDY LAKE ROAD IMPROVEMENT
PROJECT NO. ST 93-02
COPPELL, TEXAS
EQUIPMENT CHECKLIST
SCALES:
Condition: Acceptable
Calibration: 5/8/00
MIXER DRUM:
Condition: N/A (mixed in truck mixers)
Size: N/A
TRUCKS:
Condition of Drum: Acceptable
Condition of Counters and Gauges:
Acceptable
OUR REPORT NO. 98881-147A
CONDITION OF STOCKPILES
Stockpiles are being maintained.
There was a recent rainstorm
and contractor is aware of
potential problems.
BATCHING WEIGHTS:
Cement 5,170 lb. A.E.A. 30 oz.
FAA. 12,850 lb. W.R. 141 oz.
CA 19,250 lb. H20 240 gal.
H20 2,400 lb.
MIXING TIME:
Mixing truck haul distance of approximately 0.8 miles and a delivery time
of approximately 13 minutes.
OVERALL CONDITION AND COORDINATION OF PLANT:
Acceptable
Respectfully Submitted
ALPHA TESTING, INC.
Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting