Loading...
ST9302-CS000707~'~~'~ Kimley-Horn and Associates, Inc. July 7, 2000 Via mail and fax # (214) 352-3201 Mr. Robert Weber, P.E. Ed Bell Construction Company P.O. Box 540787 Dallas, TX 75354-0787 Re: Plans for 66" Storm Drain Modifications at Moore Rd. Coppell Sandy Lake Road Reconstruction KHA No. 061087000 Coppell No. ST 93-02 Dear Mr. Weber: During the June progress meeting held last week, Gary Pryor mentioned that he did not have a set of plans for the 66" storm drain modifications on the south side of Sandy Lake Road at Moore Road. After the meeting, I verified that plans had been sent on August 4t~ of last year. These plans included modifications to both the 66" storm drain and the 21" storm drain (the 21" storm drain work was completed last year). Please check to see if you still have these plans. If not, please contact me as soon as possible, and I will provide additional sets as necessary. The next monthly progress meeting is scheduled for July 18a. We look forward to your attendance, as it is vital in our efforts to resolve problems with the project and maintain project schedule. Please contact me if an emergency precludes your attendance so that I can reschedule the meeting. Very may yours, KIMLEY-HORN AND ASSOCIATES, INC. Michael G. DeMotte, E.I.T. MGD:mgd Copy to.' Mr. Ken C-riff-m, P.E., City of Coppell · Suile 1100 801 Cherry Street Fort Worth, Texas 76102-6803 · TEL 817 335 6511 MET 817 654 4266 FAX 817 335 5070 I