Loading...
MA0405-CS030801From: To: Date: Subject: Suzan Taylor rick.schnapka@verizon.com 8/1/03 8:56AM Re: Bethel School and Macarthur Mr. Schnapka: We have issued a work order for the Streets Department to look at the intersection. The Engineering Department is currently working on plans to replace the brick paver crosswalks with stamped concrete in five to seven of the major intersections along MacArthur. The newly constructed intersection at Sandy Lake and MacArthur has stamped concrete crosswalks. The intersection at Bethel School rates as one of the highest in need of repair. We must have approval from the Texas Department of Licensing and Registration to leave the existing handicapped ramps in place. If we do not get approval, the cost of replacing all of the ramps and crosswalks would be prohibitive. We will then have to look at other options for repairing the intersections. Should you have any questions, please contact me at 972-304-7019. Suzan Taylor ClP Coordinator Engineering Department >>> <rick.schnapka@verizon.com> 08/01/03 07:54AM >>> The intersection of Bethel School and Macarthur Bird continues to deteriorate. The road surface at this intersection is terrible and attracts water. And then the standing water contributes to the deterioration of the roadway. The decorative brick that is in this intersection is in need of repair for the millionth time. Please take the necessary activity to repair this before it becomes more dangerous than it already is. Whoever designed and suggested that the city install these decorative bricks at major intersections within our borders did not take into consideration the amount of wear and tear they would receive. I don't believe there are any intersections containing decorative brick that are NOT in need of repair. Looks good but not practical! Rick D Schnapka 928 Blue Jay Lane w -972 718-3936 h -972 462-1755