Loading...
MA0405-LR050614qone Engineenng 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 CoppeI1 TX 75019 Project: Brick Paver Replacement MA 04-05 Report No.: 235411 Project No.: 0510346 Date of Service: 06/08/2005 Report Date: 06/14/2005 Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECTDATA CONTRACTOR: Pavement Services Test Methods: ASTM D-2922 ASTM D-3017 No. Description Gauge: Troxler 3430 Moisture Gauge Serial No: 35518 Current: 738 Test Mode: BS Previous: 736 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Standard Counts Density Current: 2738 Previous: 2740 Project Requirements Moisture Density Recycled crushed concrete w/Clayey Sand 12.5 117.0 -2/+2 95 min FIELD DENSITY TESTS TEST NO TEST LOCATION PROBE DEPTH MfD MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pcl) (% max) Flex base 1 MacArthur, northbound lane, north 0" 1 l 1.7 127.6 114.2 98 crosswalk, grade Flex base 2 MacArthur, northbound lane, south 0" 1 11.9 128.1 114.5 98 crosswalk, grade Flex base 3 South Village at MacArthur, center of 0" 1 11.9 126.1 112.7 96 crosswalk Technician: Joe Jernigan Report Distribution: (1) CiW of Coppell (1) Cit~ of Coppell Test results on this report meet project specification. Started: 12:00p Finished: l:30pm go Clay Stark Project Manager LLM/TATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in qualJt3' (composition, appearance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wriaen approval of Roue Enginee~ng Services, Ltd [~7TM Page 1 of I