Loading...
DR0401-CN050419Construction Materials Testing and Environmental Consulting Texas CMT, Inc, 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com April 19. 2005 EXHIBIT "B" Ms. Suzan C. Taylor C.I.P. Coordinator The City of Coppell P. O. Box 9478 Coppell, Texas 75019 Via Fax: 972-304-3673 RE: Proposal No. 250403 Construction Materials Testing Oakcrest Drainage Project ~ DR 04-01 Coppell, Texas Dear Ms. Taylor: In accordance with your request, we are pleased to submit the following proposal for materials testing and observation services for the above referenced project. Types of services are based on your e-mail dated April 18, 2005. We estimate the fees will be as follows: LABORATORY TESTING Moisture Density Relationship I test ~ $170.00 per test ................................. $170.00 Atterberg Limits Test l test ~ $48.00 per test ................................... $48.00 Percent Material Finer than No. 200 Sieve 1 test ~ $25.00 per test .................................... $25.00 Total Laboratory Testing .................................. $243.00 The City of Coppell April 19, 2005 11. FIELD TESTING AND OBSERVATION A. Earthwork Testing Sampling Subgrade Soils 2 Hrs. ,~ $40.00 per hour .................................. $80.00 In-Place Moisture Density Tests (Based on 5 tests, assumes 2 trips) 5 tests ~ $38.00 per test ................................. $190.00 Trip Charges 3 trips ~ $25.00 per trip (4 hours or less) ...................... $75.00 Total of Field Earthwork Testing ........................... $345.00 B. Portland Cement Concrete Testing Periodic Observation of Concrete Placement (Based on 7 concrete placements) 18 Hrs (~ $40.00 per hour ................................ $720.00 Compressive Strength Concrete Cylinders (with Observation) (Based on 7 sets of 5 cylinders per day) 35 tests @ $20.00 per test ................................ $700.00 Trip Charges 7 trips ~ $25.00 per trip (4 hours or less) ..................... $175.00 Total of Concrete Testing ............................... $1,595.00 Total of Field Earthwork and Concrete Testing .............. $1,940.00 TOTAL OF ALL OBSERVATION AND TESTING SERVICES ..... $2,183.00 Based on the assumptions our total estimated fee to perform the aforementioned tests and services is $2,183.00. It should be noted that this proposal is based on the estimated number of tests and quantities mentioned in this proposal and not a lump sum price. The construction sequence or job conditions may require more or fewer testing or observation. Only work which is actually performed xvill be charged fbr and all charges will be in accordance with the corresponding unit ~es quoted in this proposal or our Schedule of Fees. Texas (;MT, Inc. Proposal No. 250403 Page 2 The City of Coppell April 19, 2005 We understand we have been selected for this project and therefore, when providing this estimate, we are not in violation of the engineering laws governing procurement of professional engineering contract with public entities. If this proposal is acceptable to you, please sign the enclosed copy, along with the Agreemenlfor Materials Engineering and Related Construction Observation and Materialx Testing Services, and mail it to us at your earliest convenience. We trust the inlbrmation provided herein is sufficient for your use. Should you have any COlnments and/or questions, please do not hesitate to contact us. We are looking forward to working with you. Sincerely, Text~ x Alex S~rnflento, B.S~'SE. Project Manager Construction Materials Engineering Division Richard W. Gee, P.E. President AS :RWG/dwe Enclosure Texas CMT, Inc. Proposal No. 250403 Page 3 AGREEMEN] FOR MATERIALS ENGINEERING AND RELATED CONS I'RUCTION OBSERVATION AND MATERIALS TESTING SERVICES THIS AGREEMENT is by and between: Ms. Suzan C. Taylor C.I.P. Coordinator, The City of Coppell P. O. Box 9478 Coppell, Texas 75019 hereinafter called CLIENT and Texas CMT, Inc., a Texas corporation, hereinafter called Texas CMT, who agree as follows: 1. DECLARATIONS. CLIENT desires to engage Texas CMT to provide Materials Engineering and related construction observation and materials testing services in connection x~ith CLIENT's project ("THE PROJECT") described as follows: Construction Materials Testing Oakcrest Drainage Project DR 04-01 Coppell, Texas Texas CMT has submitted a fee schedule to CLIENT, a copy of which is attached hereto and made a pan hereof as Exhibit "A", lbr Materials Engineering and related construction observation and materials testing services, which fee schedule is acceptable to CLIENT. 2. SCOPE OF WORK. Texas CMT shall provide Materials Engineering and related construction observation and materials testing services for THE PROJECT in accordance with the accompanying proposal "scope of services' made a part hereof as Exhibit B and the "terms and conditions" set forth on the back of and made a part of this Agreement. ,2004. Title:~l~resident ~)ate: 411'11' Address Zip Code __ Phone No FOP} APPROVAL OF INV()ICE(S) Il the invoice is to bc mailed for approval to someone other than the account charged, plc~se indicate where to maiI the invoice in the space below Address Z~p ('ode Ehone No PliRSON OR FIRM FO ACT AS CIdEN] 'S REPRESENTATIVE WITH RESPECT TO Tcxas CM~ 'S SFiRVICI S I~ERSONS OR FIRMS AUTHORIZED I'O RECEIVE COPIES OF rexaz CMT'S OBSERVAI ION AND I'IS F REPORIS TERMS AND CONDITIONS TO AGREEMENT FOR MATERIAI.S ENGINEERING AND RELATED CONSTRUCTION OBSERVATION AND MATERIALS TESTING SERVICES I '41 RVICES l'exas CMT will approve or accept any portion of the work unless specifically authorized in Act b~r CI IEN'I in a prol~ssional manner, using that degree of care and skill ordqlarily exercised b5 and con~stenl wdh the standards of the profession practicing m tile same or similar Iocaliiy of IHE PROJECT sde Prox ide onl5 dmse services thug in the opinion of Texas CMT, lie within the 34 lechmcal and professional areas of expertise of Texas CMT and which Texas CMl is adequatcl5 staffed and equipped to perform Perfi)rm all technical services under the general direction of a Registered Pmicssional Engineer and in substantial accordance with the baste re- q uircmems of the appropriate Standards of The American Socici). for Testing 35 and Malcrfids. x~l~ere applicable, or other standards designated by CLIENT I 4 Promptly submit formal reports of all tests, inspections and services per- Ibrmcd indicating where applicable, compliance with 'IHE PROJECT 36 specifications or other contract documents. Such reports shall be complele and Iaclual. citing the tests pcrlbrmed, methods employed, xalues obtained, parts of the structure or PROJECT area involved I s I mploy testulg machines which have been calibraled within a period not exceeding twelve monlhs from the time el' use by devices of accuracy traceable to the National Bureau of Standards of the United States Department of Commerce and , upon request, submit to CLIENT, or his 41 atflhorized representatwe, documentation of such calibration i 6 Consider ail reports to be the confidential properly of CLIEN F, and distribute reports only tn tile persons, organizations or agencies specifically designated I 7 Retain ali pertinent records relating to thc services pcrlbrmed for a period of five xears following submission of the report, during which period the records will bc made avadab[c lo CLIENT at all reasonable t~mes ARIICLE 2 CLIENT'S RISPONSIBIIdFIES CLIENI' or his authorized rep~esenlativc will 2 i Provide lexus CM[ wdh all plans, spccificafions addenda change orders, ap- proved shop drawings and other inl~armation for the proper performance el lexus CMI 42 22 Issue authorization m xwding, gJwng Texas CMT free access to TIlE PROJI CF s~le. and to all shops or yards where materials are prepared or stored 2 I DcMgnate m wrdmg a person or firm to act as CLIENT's representative vsdh respect to lexus CM F's services to be perlbrmed under this Agreement; such pers~ln or hrm to have complete authordy to transmit instrucllons, rccet'*e inlbm~ation and data, interpret and define CIdENT's policies and decisions ~xith respect to THE PROJECT and to order, at CLIENT's expense, such lechnical services as ma5 bc requested by Texas CMT 24 Designate in x~ritmg those persons or firms who are authorized to receive 5 I copies of~ exas CMT's inspection and test reports 25 Advbe Texas CMT sufficiently in advance of any operations so as to allow Ibr assignment el personnel by Texas CMT fbr completion of the required scr~ccs S ud~ advance nofice shall bc in accordance x~ith that established by mutual agreement of the partms 52 26 Direct TILE' PROJECT contractor, either b.', the Construction Contract or direc~ writien order to: la) Secure and deliver to Fexas CMT, without cost to Texas CMP, 53 prclimina~ representative samples of those materials hc proposes to usc .ah/ch reqmrc testing, logetber with any relevant data of the materials /b) Ftirnish such casual labor and all facilities needed by Texas CM'I to obtain and handle samples at TIlE PROJECT and to thcililate the specified inspection and tests Provide and maintaio for the use of Pexas CMT, adequate space at IH[ PROJECT lbr sali: storage and proper curing of test specimens 3 L/hNI RAL(.ONDIIIONS lexus {.?MY, by the perlbrmance el services cuvercd hereunder, does not ill anx way assume, abridge or abrogate any of those duties, responsibilities or authonfics ~itll regard to TIlE PROJECT customarily vested in THE PROJtCT archdecls, design engmeers or any other design agencies or Texas CMl' shall not be responsible for acts of omissions of any pan), or parties involved in the design of TIlE PROJECT or the fadure of any contractor or subcontractor lo construct any aspect of THE PROJECT in accordance with recommendations contained in any correspondence or verbal recommendation issued by lexus CM f lexus £ MT is not aulhorized to revoke, alter, relax, enlarge or release any icqmremenl ofIHE PROIECq specdications or olher conlract documents nor to 32 33 writing by CLIEN'I or bis authorized representative Texas CMT shall not have the right of rejection or the right to stop the work, except for such periods as ma) be required m conduct the sampling, testing or inspection ofopcrauons covered by thc Agreement This Agreement may be terminated by edher party on ten (10) days written notice or by mutual agreemeul If this Agreement is terminated by cithe~ pan5,, 'I exas CMT shall be paid in lhll lbr all services performed through the termination date, and the CLIENT shall be provided with a complete report nl the results of test and analysis conducted prior to termination. Neither CI.IENT nor texas CMT may delegate, assign, sublet or transfer his dudes or interest in this Agreement xMthoat the written consent of the other part) The only WARRANTY made by Iexas CMT in connection with its services per-formed hereunder is that il will use thai degree of care and skill as set Ibrth in Article 1.1 above No other WARRANTY, expressed or implied, is made or intended for services provided hereunder or furnishing oral or written reporls of findings made ARTICLE4 INSURANCE: Texas CMT shall secure and maintain throughout the full period of this Agreement sufficient insurance to protect it adequately from claims under applicable Workmen% Compeusation Acts and from claims for bodily inmrL death or properly da~nage as may arise flora the perfbrmance of services under this Agreement lexus CMT will, upon request, file certification of such insurance coverage wdh CLIENT or his authorized representative Wdhtn the limits and conddions of such insurance, Texas CMT agrees to indemnify and save CLIENT harmless from and against any loss, damage, or liability arising flora any negligent acts by Texas CMT ~ts agents, staff and consultants employed by it ]exas CMT shall not be responsible and CLIENT shall indemnify Texas CMT for an~, loss, damage or liability arising from any negligent acts by CLIENT, its agents, staff, and other consultants employed by it, and any claim asserled against Pcxas CMl unless it shall be determined that such claim is based on and resulted from failure by Texas CMT to perlbrm its services hereunder in accordance wdh this Agreement No insurance, of whatever kind or type, which may be carried by Texas CMT, is to be considered as in any way limding the contractor's or subcontractor's responsibilit) for damages resulting from his operations or for furnishing work and materials to TIlE PI~.OJEC'I CLIENT agrees, therefore, to include, or cause to be included in THE PROJECT's construction contract, such rcquiremcms lbr insurance coverage and performance bonds to be secured and maimained by THE PROJECT contractor as CLFFINT deems adequale to indemnify CLIEN g, ~1 cxas CMT, and other concerned parties, against claims for damages and to insure compliance ol x~ork perlbrmance and materials wdh THE PROJECT requirements ARTICLE 5 PAYMENT: CLIENT will pay Texas CMT lbr services and expenses in accordance with the anached fee schedule (Exhibit A) Texas CMT will submit progress invoices lo CL1ENT monthly and a final qlvoice upon completion of its work Each invoice, on presentation, is due and payable by CLIENT or his authorized representative Texas CMT shall bc paid m thll tbr all serwces under the Agreemenl. including any addithmal services m excess of those stated in the original Agreement, as specifically authorized b3 CLIENT Fhe CLIENT's obligation to pay Ibr thc work contracted ~s in no way dependent upon the CIJENT's ability to oblain financing, approval of govermnental or regulatory agents, or upon the CLIENT's successful com- pletion el the prqjecl AR'IICLE 6. EXFENI OF AGREEMI NT: The Agreement, including these terms and conddions, represents thc enfire agreement be~,~een CLIENT and Texas CM'I and supersedes ali prior negoUar~ons, representanons or agreements, written or oral Thc Agrcemenl may be amended onb by wrdlen mslruments signed by CLIENT and Texas ARTICI,E 7. APPLICABLE LAW The Agreement shall be governed by lhc laws of the State of Fcxas Texas CMT, Inc. Fee Schedule EXHIBIT "A" SCHEDULE OF SERVICES AND FEES CONSTRUCTION MATERIALS ENGINEERING SERVICES (Effective April 2004) I. ASPHALTIC CONCRETE/BITUMINOUS MATERIALS OBSERVATION/TESTING: 1.1 Asphaltic concrete mix designs a. Hveem Method, one asphalt content ................................. 290.00 b. Marshall Method, one asphalt content ............................... 360.00 c. Marshall Method, four asphalt contents .............................. 690.00 1.2 Confirmation Mix Design, using design prepared by others ............. At Unit Prices 1.3 Observation/sampling at batch plant or jobsite, per man-hour .................. 40.00 1.4 Rolling Pattern Field Nuclear Density Tests, (minimum of 3 per trip), each ....... 38.00 1.5 Asphaltic Concrete Coring, per diameter-inch ............................... 2.50 1.6 Laboratory Density of Pavement Cores, each ............................... 22.00 1.7 Molding Test Specimens (3 per set), set ................................... 48.00 1.8 Density and Percent Voids (3 per set), set .................................. 48.00 1.9 Hveem Stabilimeter Value (3 per set), set .................................. 72.00 1.10 Marshall Stability (3 per set), set ......................................... 72.00 1.11 Marshall Flow Value (3 per set), set ...................................... 14.00 1.12 Sand Equivalent, each ................................................. 68.00 1.13 Extraction, each ..................................................... 160.00 1.14 Specific Gravity of Aggregates, each ..................................... 45.00 1.15 Sieve Analysis of Aggregates, each ....................................... 45.00 1.16 Evaluation of Built-up Roofing Membrane, each ........................... 270.00 1.17 Maximum Theoretical Density, each ..................................... 140.00 1.18 Solvent Disposal Charge, each ........................................... 28.00 Revision Date: April, 2004 Page I Texas CMT, Inc. Fee Schedule 11. PORTLAND CEMENT CONCRETE AND AGGREGATES OBSERVATION/TESTING 2.1 Portland Cement Concrete Mix Design, including Specific Gravities, Absorptions, Unit Weights of Aggregates, and Gradations ............................... 160.00 2.2 Additional Mix Design (using same aggregates), each ........................ 115.00 2.3 Confirmation Mix Design Test Cylinders, each .............................. 27.00 2.4 Confirmation Mix Design Test Beams, each ................................. 27.00 2.5 Concrete Observation, per hour ........................................... 40.00 2.6 Concrete Test Cylinders (without observation), each .......................... 25.00 2.7 Concrete Test Beams (without observation), each ............................. 30.00 2.8 Concrete Test Cylinders (with observation), each ............................. 20.00 2.9 Concrete Test Beams (with observation), each ............................... 23.00 2.10 Hold Cylinders, each .......................................... See Rates Above 2.11 Concrete Reinforcing Steel Observation (Shop or Field), per hour ............... 40.00 2.12 Air Content Measurement when not making cylinders or beams (minimum three hours technician time), each ................................ 23.00 2.13 Unit Weight of concrete when not making cylinders or beams (minimum three hours technician time), each ................................ 23.00 2.14 Specific Gravity, each .................................................. 45.00 2.15 Absorption, each ...................................................... 21.00 2.16 Gradation (ASTM C-136), each .......................................... 45.00 2.17 Sieve Analysis (material finer than #200 U.S. Sieve), each ..................... 25.00 2.18 Sulphate Soundness a. Five Cycles, each ................................................ 245.00 b. Each additional cycle .............................................. 69.00 2.19 Concrete Coring with Technician Time, per diameter-inch ...................... 2.50 2.20 Capping and Testing Concrete Cores, each .................................. 25.00 2.21 Sawing Core Ends, per end ............................................... 9.00 Revision Date: April, 2004 Page 2 Texas CMT, Inc. tee Schedule 2.22 Compressive Strength of brick, block or grout per specimen .................... 27.00 2.23 Flexural Strength of brick or block, per specimen ............................ 33.00 2.24 Non-destructive Concrete Testing (excludes expendable materials), per hour ....... 68.00 2.25 Compressive Strength of 2 Block Prism, each ............................... 50.00 111. SOIL OBSERVATION/TESTING 3.1 Continuous Observation and Testing of earthwork by Technician with nuclear gauge, per hour ....................................................... 49.00 3.2 In-Place Moisture-Density Tests (minimum of 3 tests per trip) a. Nuclear Method, each 38.00 b. Other Methods, each .......................................... By Request 3.3 Material Sampling, per hour ............................................. 40.00 3.4 Moisture Content, each .................................................. 6.00 3.5 Atterberg Limits ( including Liquid and Plastic Limits), each ................... 48.00 3.6 Linear Bar Shrinkage, each .............................................. 20.00 3.7 Slaked and Washed Sieve Analysis a. Materials processed over No. 40 U.S. Sieve, each ........................ 25.00 b. Materials processed over No. 200 U.S. Sieve, ASTM D-422, each ........... 25.00 3.8 Hydrometer Analysis (including sieves), each .............................. 190.00 3.9 Gradation of Lime Stabilized Soil per TSDHPT, Item 260, per hour (minimum of 3 hours per trip) ..................................... 40.00 3.10 Preparation of Base Materials Binder for testing, each ......................... 25.00 3.11 Maximum and Minimum Density Tests, each ............................... 110.00 3.12 Specific Gravity Tests, each ............................................. 45.00 3.13 Moisture-Density Relationship a. Standard Method, ASTM D-698 or AASHTO T-99, each ................. 170.00 b. Modified Method, ASTM D-1557, AASHTO T-180 or TEX-113E, each .... 180.00 c. TSDHPT Method TEX-114E, each .................................. 250.00 3.14 Moisture-Density Relationship with lime or cement a. Standard Method, ASTM D-698 or AASHTO T-99, each ................. 185.00 b. Modified Method, ASTM D-1557, AASHTO T-180, or TEX-113E, each .... 195.00 c. TSDHPT Method TEX~114E, each .................................. 260.00 Revt~ion Date: April, 2004 Page 3 Texas CMT, Inc. Fee Schedule 3.15 3.16 3.17 3.18 3.19 3.20 TSDHPT Triaxial Series, TEX-117E, each ............................. By Request TSDHPT Wet Ball Mill Analysis, TEX-116E, each .......................... 200.00 Los Angeles Abrasion (small aggregate), each .............................. 200.00 Sample Preparation for L.A. Abrasion or Wet Ball Mill Analysis, each aggregate ........................................................ 40.00 California Bearing Ratio (CBR), laboratory performed a. Native materials, per specimen ...................................... 290.00 b. Lime or cement treated, per specimen ................................ 320.00 Strength and Durability of Cement Stabilized Soils a. Curing and testing of Compression Samples, each .................. By Request b. Wet-Dry Test, ASTM D-559 or AASHTO T-135, each .............. By Request c. Freeze-Thaw Test, ASTM D-560 or AASHTO T-136, each ........... By Request d. Preparation of Samples for a, b, or c, each ......................... By Request 3.21 Phenolphthalein Lime Indicator Charge, per trip ............................. 12.00 IV. OBSERVATION/TESTING OF STRUCTURAL STEEL/WELDING 4.1 Ultrasonic/Magnetic Particle/Liquid Penetrant by Level II Technician with equipment (portal to portal) per hour including standby .................... 55.00 4.2 Visual Observation a. Structural Steel/Welding Observation - (Shop or Field), per hour ............ 49.00 4.3 Witness of Welders Qualification in Field Plate or Pipe Test, per hour (4 hour minimum, portal to portal) .................. 49.00 4.4 Welders Qualification at our laboratory a. Pipe Test - AWS or ASME I position - 6" Schedule 40 ......................................... 110.00 2 position - 6" Schedule 40 ......................................... 155.00 1 position - 6" Schedule 80 ......................................... 110.00 2 position - 6" Schedule 80 ......................................... 155.00 Plate Test - 1 position- 2 position - 1 position- 2 position - AWS or ASME (inc. all mats and testing in laboratory) limited thickness, 3/8" plate ............................... 115.00 limited thickness, 3/8" plate .............................. 155.00 unlimited thickness, 1" plate .............................. 110.00 unlimited thickness, 1" plate .............................. 155.00 4.5 Plate Test - Texas Highway Department Standard Specification I position - 1" plate ................................................... 180.00 2 position - 1" plate ................................................... 300.00 Revt~ion Date: April, 2004 Pege 4 Texas CMT, Inc. tee Schedule 4.6 Tensile Strength Tests (50.00 min. charge - machine costs, sampling extra) a. Reduced Sections 10 or less, each ................................................... 48.00 11 or more, each .................................................. 43.00 b. Reinforcing Steel # 3 to # 10, each .................................................. 43.00 # 11 to # lg, each ................................................. 48.00 V. PROFESSIONAL/TECHNICAL SERVICES 5.1 Typist, per hour ....................................................... 40.00 5.2 Engineering Inspector/Technician, per hour ................................. 40.00 5.3 Field Supervisor. per hour ............................................... 70.00 5.4 Draftsman, per hour .................................................... 75.00 5.5 Staff Engineer, per hour ................................................. 80.00 5.6 Project Geotechnical Engineer, per hour .................................... 90.00 5.7 Engineering Manager, per hour .......................................... 105.00 5.8 Principal Engineer, per hour ............................................ 135.00 5.9 Expert Witness, Depositions, Testimony by Principal Engineer, per hour ......... 1 g0.00 VI. GENERAL NOTES 6.1 6.2 6.3 6.4 6.5 6.6 Minimum charge lbr report .............................................. 35.00 Reproduction, per page .................................................. 0.32 Hourly rate quoted at regular rate only (portal to portal), Mondays to Fridays, 7:30 am- 5:00 pm Vehicle Transportation Charges for All Field Services Per one-half day within 30 miles of laboratory, per trip ........................ 25.00 Over four hours within 30 miles of laboratory, per trip ........................ 46.00 Outside of these parameters ......................................... By Request Subsistence, per man-day .............................................. 100.00 All direct expenses required/approved .............................. Cost plus 15% Terms of payment ........................................... Due Upon Receipt Finance charge past 30 days 1 1/2% per month, annual rate ...................... 18% Revision Date: April, 2004 Page 5