Freeport NIP(8.0)-CS050621COl'FELL
June 21, 2005
C. Jack Evans, P.E.
PachecoKoch
8350 N Central Expy, Ste 1000
Dallas TX 75206
RE:
Duke Freeport, Lot 6 & 7, Block A (Freeport XI & XII)
Final Acceptance
Dear Mr. Evans:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities
for the referenced project. The two-year maintenance bonds and as-built drawings have been
received from the contractor. Maturity on the bonds will be two years from the date of this
letter.
You may notify the MS4 (City of Coppell) at an3' time during the two-year maintenance period if
stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a
Notice of Termination (NOT) to discontinue coverage under the SWPPP permit.
A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond
period. If any punchlist items are noted at that time, you will be contacted to make repairs.
Thanks for your cooperation.
Sincerely
L /~, .',._
arty L~aVlS
Construct]on Inspector
Office Phone: (972) 304-3684
Fax: (972) 304-3570
CC:
Ken Griffin, P.E., Director of Engineering & Public Works
Keith Marvin, P.E., Civil Engineer
Glenn Holloweli, P.E., Assistant Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal
Brian Straley, Duke Construction