Four Seasons 2R-CS050621T H E C I T ¥ O F
COP?ELL
June 21, 2005
Charles Hoagland
Hill & Wilkinson, Ltd.
800 Klein Rd, Suite 100
Piano TX 75074
Four Seasons Addition, Lot 2R (BCE Specialties)
Final Acceptance
Dear Mr. Hoagland:
Representatives of the City of Coppell have confirmed a final inspection of paving and
utilities for the referenced project. Thc two-year maintenance bonds and as-built drawings
have been received from the contractor. Maturity on the bonds will be two years from the
date of this letter.
You may notify the MS4 (City of Coppell) at any time during the two-year maintenance
period if stabilization of thc site per the SWPPP permit can be demonstrated, if so,
complete and submit a Notice of Termination (NOT) to discontinue coverage under the
SWPPP permit.
A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year
bond period. If any' punchlist items are noted at that time, you will bc contacted to make
repairs. Thanks for your cooperation.
Sincerely;' '
Larry Davis
ConStruction Inspcetor
Office Phone: (972) 304-3684
Fax: (972) 304-3570
CC:
Ken Griffin, P.E., Dir. of Engineering & Public Works
Keith Marvin, P.E., Civil Engineer
Glenn Hollowell, P.E., Asst. Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal
C. Jack Evans, P.E.. Pacheco Koch
c,O P,P, ELL