Ballet TX-LR050620SAM ENGINEERING & TESTING, L.P.
Serving The Geo-lndustry Since 1974 '~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
Materials
IN-PLACE DENSITY OF SOIL
CLIENT: Head Construction, Inc. REPORT DATE: 6/20/05 TEST DATE: 6/20/05
3030 LB J, Suite 700
Dallas, TX 75234~~"'''~''' TEST METHOD:ASTMD-2292 & 3017
PROJECT: Propo~g~ra_llet~ '-Academy of Texas *ASTM D698A - See Proctor Report for Details
.,~l,45"-Fit n essCourt
w Coppell, TX Minimum Required Compaction = 95%
PROJECT#: 286TXIK5 REPORT#: '13 PAGE 1 OF 1
ATTN: Ken Head SE&T TECHNICIAN: Mark Brumley
T~ST ~REA FIELD RESULTS ~B RESULTS *
No~h Fire Lane - West End Final .5 115 12 2 117 12 9-15 98 P
East Fire Lane - South End Final .5 116 13 2 117 12 9-15 99 P
No~heast Corner of Fire Lane Final .5 113 13 2 117 12 9-15 ~'97 P
All densities meet the minimum required values unless otherwise noted, It has
project and we trust that this report is satisfactory.
Very Truly Yours,
SAM Engineering & Testing, L P.
Sadik (SAM) Al-Musawe, M.Sc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
pleasur
/
G:/2005/286txik5/Density/Den 13