Loading...
Ballet TX-LR050622SAM ENGINEERING & TESTING, L.P. 'I~ Serving The Geo-lndustry Since 1974 ,~ 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790-0967 IN-PLACE DENSITY OF SOIL CLIENT: Head Construction, Inc. REPORT DATE: 6/22/05 TEST DATE: 6/21/05 3030 LB J, Suite 700 Dallas, TX 75234 TEST METHOD:ASTMD-2292 & 3017 PROJECT: Propo~s *ASTM D698A - See Proctor Report for Details ,~s Court Coppell, TX Minimum Required Compaction = 95% PROJECT#: 285TXIK5 REPORT#: 14 PAGE 1 OF 1 ATTN: Ken Head SE&T TECHNICIAN: Mark Brumle¥ TEST AREA FIELD RESULTS ~ LAB RESULTS * No~hwest Corner Final 1 114 13 4 117 13 10-16 97 P Southeast Corner Final 1 116 14 4 117 13 10-16 99 P Middle Final 1 113 14 4 117 13 10-16 96 P No~heast Corner Final 1 115 13 4 117 13 10-16 98 P Southwest Corner Final 1 115 13 4 117 13 10-16 98 P Fire Lane - No~hwest Corner Final .5 113 12 2 117 12 9-15 96 P Fire Lane - No~h Middle Final .5 115 13 2 117 12 9-15 98/ P All densities meet the minimum required values project and we trust that this report is satisfactory. Very Truly Yours, SAM Engineering & Testing, L.P Sadik (SAM) AI-Musawe, M.Sc., Ph.D., Civil & Environmental Engineer Texas Registration Number: 61893 been a pleasure to serve you on this