ST9302-LR000602ALPHA TESTING, INC.
2209 Wisconsin St., Suite I00
Dallas, Texas 70229
972/620-8911 - 972/263-4937 (Metro)
FAX:
TESTED FOR
CITY OF COPPELL
COPPELL, TEXAS
REPORT OF FIELD
COMPACTION TESTS
DATE 06/02/00
PROJECT
SANDY LAKE ROAD
PROJECT NO. ST 93-02
COPPELL, TEXAS
OUR REPORT NO.
98881-134
TEST DATA:
TEST ~ ELEV. SOIL ID omvau~ MAX~aU~ L~ ~ ~CACE ~ PEACE. r,~RCENT
NO. DATEDEPTH~,~t NUMBER MO~llJRE DRY D~NffiITYMO~qTtJR~ DRY DEN~TY CO~=AC~ON COMMENT*
427 06102/00 FG 9L 18.1 107.3 19.7 103 96 3-A
428 06/02/00 FG 9L 18.1 107.3 19.1 103 96 3-A
429 06102/00 FG 9L 18.1 107.3 21.1 104 97 3-A
430 06/02/00 FG 10L 16.6 110.3 17.8 110 99 3-A
431 06/02/00 FG 10L 16.6 110.3 17.0 108 98 3-A
432 06/02/00 FG 9L 18.1 107.3 18.7 103 96 3-A
433 06102/00 FG 9L 18.1 107.3 18.7 103 96 3-A
TEST LOCATION:
427 PAVING AT SANDY LAKE ROAD AT STATION #71+00 NORTH SIDE
428 PAVING AT SANDY LAKE ROAD AT STATION #72+00 SOUTH SIDE
429 PAVING AT SANDY LAKE ROAD AT STATION #74+00 NORTH SIDE
430 PAVING AT SANDY LAKE ROAD AT STATION #75+50 SOUTH SIDE
431 PAVING AT SANDY LAKE ROAD AT STATION #76+50 NORTH SIDE
432 PAVING AT SANDY LAKE ROAD AT STATION #78+50 SOUTH SIDE
433 PAVING AT SANDY LAKE ROAD AT STATION #79+50 NORTH SIDE
CC: NONE
1. FIlL
2. NATURAL SUBGRADE
3, UME STABILIZED
4. CEMENT TREATED
Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting
ALPHA TESTING, INC.
2209 Wlscor~n St., Suite 100
Do#os, Texa~ 7,5229
972/620-8911 - 972/263~937 (Metro)
FAX:
TESTED FOR
CITY OF COPPELL
COPPELL, TEXAS
REPORT OF FIELD
COMPACTION TESTS
DATE 06~2/00
PROJECT
SANDY LAKE ROAD
PROJECT NO. ST 93-02
COPPELL, TEXAS
OUR REPORT NO.
98881-134A
TEST DATA:
TEST ___~_.. ELEV. SOIL ID o~nuuM U~JUUU LAB ~N ~ ~N ~ ~RCENT
NO. DATE NUMBER uo~ru~E ORY ~ UO~m~S ORY~ CO~O~ COMMENT*
434 06102/00 FG 10L 16.6 110.3 17.7 108 98 3-A
435 06/02/00 FG 10L 16.6 110.3 18.2 107 97 3-A
436 06/02/00 FG 8L 22.2 94.7 23.1 96 101 3-A
437 06/02/00 FG 10L 16.6 110.3 16.9 109 99 3-A
438 06/02/00 FG 10L 16.6 110.3 17.7 111 101 3-A
439 06/02/00 FG 11L 13.7 109.4 16.3 109 99 3-A
440 06/02/00 FG 11L 13.7 109.4 14.5 109 100 3-A
434 PAVING AT SANDY LAKE ROAD AT STATION #82+00 NORTH SIDE
435 PAVING AT SANDY LAKE ROAD AT STATION ~63+00 SOUTH SIDE
436 PAVING AT SANDY LAKE ROAD AT STATION #85+00 NORTH SIDE
437 PAVING AT SANDY LAKE ROAD AT STATION #86+00 SOUTH SIDE
438 PAVING AT SANDY LAKE ROAD AT STATION ~7+50 NORTH SIDE
439 PAVING AT SANDY LAKE ROAD AT STATION #88+50 SOUTH SIDE
440 PAVING AT SANDY LAKE ROAD AT STATION #93+50 NORTH SIDE
CC: NONE
t. FILL
2. NATURAL SU~GRAD~
3. UME ~TAI~UZED
4. CEMENT TREATED
Geotechnicel Engineetfng · Construction Materials Testing · Environmentel Engineering · Consulting
* K IN PIJ~cEPERCENTMoI~REN~DPERCENTCOMPACTIONcOMI~YWITHSPEclFIcA~ONS
~ I~CENT COMPACTION ~ NOT COMPLY WITH ~=F-ClFICAllOI~
C. pIERCENT IN PLACE MOIS~JRE DOES NOT COMPf-Y Wr~l ~CFICAllONS
D. R~
R S
A
ALPHA TESTIN( , INC.
2209 Wisconsin ~., Suite I00
Dallas, Texas 7,5229
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/~$
TESTED FOR
CITY OF COPPELL
COPPELL, TEXAS
REPORT OF FIELD
COMPACTION TESTS
DATE 06/02/00
PROJECT
SANDY LAKE ROAD
PROJECT NO. ST 93-02
COPPELL, TEXAS
OUR REPORT NO.
98881-134B
TEST DATA:
TEST ~ ELEV. SOIL ID O~nMUM MAXIMUM lAB IN RACE IN PLACE PERCENT
NO. DATEDEPT~,,~ NUMBER MOk.qTURE DRY DENSITY MOISTURE DRYOEN.srrY CO~,,~C'nO~ COMMENT*
441 06/02/00 FG 11L 13.7 109.4 13.7 107 98 3-A
442 06/02/00 FG 10L 16.6 110.3 16.7 110 100 3-A
443 06102/00 FG 10L 16.6 110.3 16.8 108 97 3-A
~.~. 06102/00 FG 10L 16.6 110.3 16.6 111 100 3-A
TEST LOCATION:
441 PAVING AT SANDY LAKE ROAD AT STATION #94+00 NORTH SIDE
442 PAVING AT SANDY LAKE ROAD AT STATION #101+30 SOUTH SIDE
443 PAVING AT SANDY LAKE ROAD AT STATION #100+00 NORTH SIDE
~.~.~.PAVING AT SANDY LAKE ROAD AT STATION #97+00 SOUTH SIDE
CC.' NONE
1. FILL
2. NATURAL SUBGRADE
3. LIME S1'ABIUZED
4. CEMENT 7RF..ATED
e A. IN Pt. ACEPE, RCENTMOI~TUREANDIwERCENTCOMPA~ cOMI:q-YWITH SPEc~'IcATK)NS
B. PERCENT COMPACTION DOES NOTCOMPLYWTTHSPEClFICAT1ONS
C, I:~RC~NT IN PI.ACE ~REDO~$ NOT COMi:~Y WITH ~:~EcJFIcA~
O. RETEST
Geotechnicel Engineering · Construction Materials Testing · Environmentel Engineering · Consulting