Loading...
RC Townhomes-CS05062806/28/20~5 8o.~=~'> 972],0,:i$0U TO,IflHEIflEL-; OF COPPELL P~GE Ri_ JR ROSE DEVELOPMENT LLC Tuesday .June 28, 20t)5 Keith Man'm, C~vil Engineer 255 Parkway Blvd. Coppc[l, TX 75019 (972) 3(14-7044 Tel. (972) .304-3570 Fax Dear Mr Marvin: Here are the SWPPP reports f,~t the month of June. I have also included a letter from our Engineer of record [)on Peebles regarding ~qe (htch to the east of our properD'. He "shot" the g~ades of the ditch and found only .5' ,of fall to a, point 21)(} feet not:th of thc footbridge 'That is roughly 700' from the south east corner of ottr property. In addition, the natural water level appears to be 1 to 2 inches above the bottom of the cbt(-h. '~'e have made the grading adlustments as tetluested by yoU~ engtr~eering department. B7c continue to lq~avflv water our sodded .areas to assure Omi it is successfully estabhshed and wflJ conmme to do so un~/ objected othet~'ise. The final dra~nag~ will be maintained and finally established for lots 1-4 & 5-8 ~o the area dram upon the placement of the permanent landscaping in these a.teas and the removal ot the temp~ ~raD' trailer. (;urrenfly Verizon and Comcast are trenching and working along this properD' hne. As we have and continually sl~ve to move forward on this proiect we are again tequesm~g release of building perrmts. t'hank you for your Ume and cens~deration, and please call if you have any further questions- Respectfully, Jason K. Rose. ,t~hitr~[ 'tX ¢¢ ~ ~4 ! member 04 ~. t!~: -v.~v~x~ v~at~' ~v*! ofth~ v,~t }~nd appemrs to ~e al~pro~<iu~lely [-2 h3ch~s abo~e the