Ballet TX-LR050624CLIENT:
=ROJECT:
Geotechnical
SAM ENGINEERING & TESTING, L.P,
~ Serving The Geo*lndustry Since 1974
1115 Luke Street, Su~te~OO- '~_y
CONCRETE PLACEM INSPECTION & STRENGTH TEST REPORT
Head Constructi~:~l~c.
3030 LB J, S~td~700
D75234
Proposed Ballet Academy of Texas
145 Fitness Court
Coppell, TX
kTTN: Ken Head
~E&T TECHNICIAN: Mark Brumley
LOCATION OF PLACEMENT: Pavement - Parkin
STANDARD 6" X 12"
AREA 28.27 SQ. IN.
REPORT DATE: 6/24/05
SAMPLE DATE: 6/24/05
~ROJECT NO.: 286TXIKS
~EPORTNO.: 15
PAGE '1 OF 3
Arrived: 5:00 AM
Time Left: 8:30 AM
Concrete Temperature (F):
Air Content:
8
85
N/A
Total No. of Test Cylinders Made: 12
Total Cubic Yards Placed: 300
Water: N/A
Weather Conditions: Dark & Warm
77
Concrete Supplier: Nelson Bros.
Ticket #: 154007
Truck #: 105
Time Batched: 4:51 AM
Time Sampled: 5:30 AM
Product Code: 3600
Cement: N/A
Fly Ash: N/A
Coarse Aggregate: N/A
Water: N/A
144 Air Content: N/A
lA 7 7/1/05 3600/28
1 B 14 7/8/05 3600/28
1C 28 7/22/05 3600/28
1D 28 7/22/05
Curing ASTM C-31 Test Method Cylinder Made By:
Slump ASTM C-143 ASTM C-39 & 231 SE&T
Remarks:
Very Truly~_Yours, ~[' J
Sadik (SAM) AI-Musawe, MSc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
3600/28
Cylinders Tested By:
This report is for the sole use of the client addressed. The use of our company name must receive our prior,~f~n~sent.
This report only applies to the samples tested and does not necessarily represent identical or similaWamp~'~.._
G:/2005/286bdk5/Cpistr/Cpistr 15LL
SAM ENGINEERING & TESTING, L.P.
1~ Serving The Geo-lndustry Since 1974 ~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790~1910 · FAX: (972) 790-0967
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
ICLIENT: Head Construction, Inc. STANDARD 6" X 12"
3030 LB J, Suite 700 AREA 28.27 SQ. IN.
Dallas, TX 75234
REPORT DATE: 6/24105
PROJECT: Proposed Ballet Academy of Texas
145 Fitness Court SAMPLE DATE: 6/24~05
Coppell, TX
PROJECT NO.: 286TXlK5
ATTN: Ken Head
REPORT NO.: 18
SE&T TECHNICIAN: Mark Brumley
LOCATION OF PLACEMENT: Pavement - North Front Parkinc~ PAGE 2 OF 3
Time Arrived: 5:00 AM Concrete Supplier: Nelson Bros.
Time Left: 8:30 AM Ticket #: 154018
Slump (Inches): 5 Truck #: 222
Concrete Temperature (F): 86 Time Batched: 5:48 AM
% Air Content: N/A Time Sampled: 6:30 AM
Total No. of Test Cylinders Made: 12 Product Code: 3600
Total Cubic Yards Placed: 300 Cement: N/A
Added Water: N/A Fly Ash: N/A
Weather Conditions: Sunny & Warm Coarse Aggregate: N/A
Air Temperature (F): 80 Water: N/A
Unit We ht of Fresh Concrete: 146 % Air Content: N/A
2A 7 7/1/05 I 3600/28
2B 14 7/8/05I 3600/28
2C 28 7/22/05 3600/28
2D 28 7/22/05 3600/28
Curing ASTM C-31 Test Method Cylinder Made By: Cylinders Tested By:
Slump ASTM C-143 ~,STM C-39 & 231 SE&T
Remarks:
Ver~ Truly Yours,
~' .
Sadik (SAM) AI-Musawe, M.Sc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent.
This report only applies to the samples tested and does not necessarily represent identical or similar samples.
G:/2005/286txik5/Cpistr/Cpist r 15LL
SAM ENGINEERING & TEST,NG, L.P.
Serving The Geoolndustry Since 1974 ,~
1115 Luke Street, Suite 100
irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
Testing
G eot e:;hnical
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
CLIENT:
PROJECT:
Head Construction, Inc.
3030 LB J, Suite 700
Dallas, TX 75234
Proposed Ballet Academy of Texas
145 Fitness Court
Coppell, TX
ATTN: Ken Head
SE&T TECHNICIAN: Mark Brumley
LOCATION OF PLACEMENT: Parkin~l - Southeast Side
Time Arrived: 5:00 AM
Concrete Supplier:
Ticket #:
STANDARD 6" X '12"
AREA 28.27 SQ. IN.
REPORT DATE: 6/24/05
SAMPLE DATE: 6/24/05
PROJECT NO.: 286TXIK$
REPORT NO.: 15
PAGE 3 OF 3
Nelson Bros.
Time Left: 8:30 AM 154022
Slump (Inchesl: 8 Truck #: 221
86 Time Batched: 6:15 AM
Concrete Temperature (F):
% Air Content:
Fly Ash:
N/A Time Sampled: 7:30 AM
Total No. of Test Cylinders Made: 12 Product Code: 3600
Total Cubic Yards Placed: 300 Cement: N/A
Added Water: N/A N/A
Coarse Ag~re(jate: N/A
Water: N/A
Sunny & Hot
Air Temperature (FI: 81
~ht of Fresh Concrete: 143
Weather Conditions:
% Air Content: N/A
3A 7 7/1/05
3600/28
3600/28
3600/28
3600/28
Cylinders Tested By:
3B 14 7/8/05
3C 28 7/22/05
3D 28 7/22/05
ASTM C-31 Test Method Cylinder Made By:
) ASTM C-143 ASTM C-39 & 231 SE&T
Remarks:
Very Truly Yours,
Sadik (SAM) AI-Musawe, M.Sc., Ph.~
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent.
This report only applies to the samples tested and does not necessarily represent identical or similar samples.
G:120051286txik51CpistrlCpistr15LL