Loading...
Coppell Trade-LR050623REPORT OF REINFORCING STEEL OBSERVATION 'l aff;Icon 8901 Carpenter Prwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 06/23/05 93345 Coppell Trade Center LP 5055 Keller Springs Rd Ste 300 Addison, TX 75001 Report No.: Project No.: Project: 94051190.0051 9405119O Coppell Trade Center - Bldg C NWC Sandy Lake/Freeport Pkwy Coppell, TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA General LayoutJC 1.1, dated 6/23/05 Locations/Items Observed: W. side Paving: 100' to 300' S of N. side of Main Building Test Method: Visual Observation REPORT OF OBSERVATION ITEMSORSERVED CORRECT INCORRECT ITEMSOBSERVED CORRECT' INCORRECT ITEMSOBSERVED CORRECT INCORRECT Placing Drawings/~oproved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X P~oper Bar Placement X Stirrup Spaci*ag & Type Bar Grade X Propedy Tied X Welded Splices Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To: Technician: D. Hogland Report DIstribution: (1) Coppell Trade Center LP (1) TechniStructures (1) City of Coppell TX (1) City of Coppell TX 309pdr ll'erracan This repot[ is exclusively for the use of the client indicated above and shall not be reproduced without written approval of HBC/Terracon, CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051081.0066 Service Date: May 31,2005 Client: Coppell _-I'ra~ At--is 5055 Keller Springs Rd Ste 300 Addison TX 75001 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: June 23, 2005 Project: Coppell Trade Center NWC Sandy Lake & State St Coppell, TX Project Number: 94051081 Material Information Specified Strength: Batch Time: Supplier: Truck No: Mix I.D. No.: Ticket No: Sample Information Sample Time: Date Cast: May 23, 2005 Technician: Contractor Made Weather Conditions: Placement Method: Sample Locations: E side Wing Wall Placement Location: Double 8x4 Box Culvert, Wing Wall E side Field Test Data Test ReSult Specification Test Method Slump, inches: Air Content, %: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen Diameter Area Date No. ID (inches) (sq. inches) Tested 1 1 6.00 28.27 05/30/2005 1 2 6.00 28.27 05/30/2005 1 3 6.00 28.27 06/20/2005 1 4 6.00 28.27 06/20/2005 ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Test Load Strength (days) (lbs) {psi) 7 130,230 4,610 ~ 7 123,650 ~_4~370 / Average 454,6~ 28 160,720 28 155,950 Average 5,600 Comments: Not tested for plastic unit weight, th~ Services - Pick up test cylinders cast by others and return laboratory for curin~ ajad~g. Report Distribution: . (1) Coppell Trade Center LP (1) Merriman Assoc Ins J/~ j~/',,~ /~ (1) PritchardAssociateslnc (1)McFadden&Miller Reviewed by: .~ ~,'C./v /.r.~ -- ///' (1) City of Coppell TX Robert D. Ray, EL Ey (1) City of Coppe[I TX Senior Project ~....get. , The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ,CONCRETE COMPRESSIVE. STRENGTH TEST Report Number: 94051190.0036 Service Date: June 14, 2005 Client: Coppell Trade Center LP Attn: Al Sorrels 5055 Keller Springs Rd Ste 300 Addison TX 75001 1rerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630.1010 Report Date: June 23, 2005 Project: Coppell Trade Center- Bldg C NWC Sandy Lake/Freeport Pkwy Coppell, TX Project Number: 94051190 Material Information Specified Strength: 4000 psi (~ 28 Days Batch Time: 6:11am Plant: 141 Supplier: TXI Truck No: 510 Ticket No: 62261 Mix I.D. No.: 8206 Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Result Slump, inches: 5.00 Air Content, %: 4.2 Concrete Temperature, o F: 92 Ambient Temperature, o F: 74 Plastic Unit Weight, pcf: N/A Laboratory Test Data Sample Information Sample Time: 7:00am Date Cast:June 14, 2005 Technician: Russell Jones Weather Conditions: Partly cloudy Accumulative Yards: 40 Placement Method: Direct Discharge Sample Locations: See attached sketch Placement Location: Pavement Specification 3-5 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Set Specimen Diameter Area Date No. ID (inches) (sq. inches) Tested 1 1 6.00 28.27 06/21/2005 7 121,990 4,310 1 2 6.00 28.27 06/21/2005 7 120,940 4,280 Average 4,300 1 3 07/12/2005 28 1 4 07/12/2005 28 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual sarnp]es tested at the Icoation(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 2 ,CONCRETE COMPRESS VE STRENGTH TEST Report Number: 94051190.0036 Service Date: June 14, 2005 Client: Coppell Trade Center LP Attn: Al Sorrels 5055 Keller Springs Rd Ste 300 Addison TX 75001 l['arracon 8901 Carpenter Frwy, Ste#100 Dallas, Texas 75247 (214) 630-1010 Report Date: June 23, 2005 Project: Coppell Trade Center- Bldg C NWC Sandy Lake/Freeport Pkwy Coppell, TX Project Number: 94051190 Material Information Specified Strength,: 4000 psi @ 28 Days Batch Time: 9:49am Supplier: TXI Truck No: 110 Mix I.D. No.: 8206 Water Added Onsite Before Test: Water Added Onsite After Test: Field Test Data Test Plant: 141 Ticket No: 62604 0 Gallons 0 Gallons Result Slump, inches: 4.50 Air Content, %: 4.0 Concrete Temperature, O F: 96 Ambient Temperature, o F: 90 Plastic Unit Weight, pcf: N/A Laboratorl~ Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 2 1 6.00 28.27 2 2 6.00 28.27 2 3 2 4 Sample Information Sample Time: 10:24am Date Cast: June 14, 2005 Technician: Russell Jones Weather Conditions: Partly cloudy Accumulative Yards; 240 Placement Method: Direct Discharge Sample Locations: See attached sketch Placement Location: See page 1 Specification 3-5 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 06/21/2005 7 130,620 4,620 06/21/2005 7 131,600 4,650 Average 4,640 07/12/2005 28 07/12/2005 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Russell Jones Re port Dis, ri but ion; (1) Coppell Trade Center LP (1) Merriman Assoc Inc (1) TechniStructures (1) McFadden & Milter Reviewed by: (1) City of Coppell TX (1) Macatee Engineering Inc Robert D, Ray, S.E;~7/ (1) city of Coppe~l TX Senior Project Manger The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the asev~f the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actca[ samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. MATCHUNE SEE SHT. I I S 89'53'16' E 1275o0g" HBClTERRACON REPORT NO. I1