Ballet TX-LR050628 E.G .EE. .G & TEST .G, L.P.
1~ Serving The Goo-Industry Since 1974 .~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 o FAX: (972) 790-0967
Materials
Testing
DRILLED PIER INSPECTION REPORT
REPORT DATE: 6/29/05 Tf-~T DATE: 6/28/05
CLIENT: Head Construction, Inc. TEST METHOD: Visual
3030 LB J, Suite 700
Dallas, TX 75234 ~ CASING (YES/NO): YES*
f CASING DEPTH (FT):
PROJECT: Proposed Ball Texas WATER I DRY (FT): *
145 Fitnes~,~urt
Copp~X PLUMB (YES I NO): YES
ATTN: Ken Head SE&T TECHNICIAN: Dominic Gonzales
PROJECT NO.: 286TXlK5 REPORT NO. PAGE t OF 3
10 30" 24" 24 19 Hard to yeP/hard gray SHALE
14 30" 24" 22.6 17
20 30" 24" 24.2 19
13 24" 18" 24 18
12 24" 18" 24.2 18
11 24" 18" 23.5 17.5
15 30" 24" 22.0 17.0
r
Notes: * (1). The above pier numbers are per the attached sketch.
(2). Water seepages were encountered in all piers. Therefore, steel casings with a 24" diameter/
15'-16' deep, a 30" diameter/16'-20' deep and a 30" diameter/20' deep were used.
(3). All above piers were satisfactory and in-accordance with the on-site foundation plan
Steve Foose and dated 5118105. I I I _~'~,,{~,_..~__1-
Reinforcing steel placed per plans & specifications unless otherwise noted.
It has been a pleasure to serve you on this project & we trust that this
Very Truly Yours,
SAM Engineering & Testing, Inc.
Sadik (SAM)AI-Musawe, MSc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
satisfactory.
G:120051286txik51DpirlDpir17ILL
SAM ENGINEERING & TESTI.G,
Serving The Geo-lndustry Since 1974 '~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
Materials
Testing
Investigation
Environmental
CLIENT:
PROJECT:
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
Head Construction, Inc.
3030 LB J, Suite 700
Dallas, TX 75234
Proposed Ballet Academy of Texas
145 Fitness Court
Coppell, TX
ATTN: Ken Head
SE&T TECHNICIAN: Dominic Gonzales
ISTANDARD 6" X 12"
'AREA 28.27 SQ. IN.
REPORT DATE: 6/29/05
SAMPLE DATE: 6/28/05
PROJECT NO.: 286TXIK5
REPORT NO.: 18
LOCATION OF PLACEMENT: Piers # 10,11,12 & 13
PAGE 2 OF 3
Time Arrived: 8:00 AM Concrete Supplier: Southern Star
Time Left: 3:45 PM 330402
5 Truck #: 1054
Concrete Temperature (FI: 91 Time Batched: 11:55 AM
% Air Content: N/A Time Sampled: 12:40 PM
Total No. 4 Product Code: 9329
Total Cubic Yards Placed: 30 Cement: N/A
Added Water: N/A , Ash: N/A
Weather Conditions: Cloud)/& Warm Coarse A~l~/re~ate: N/A
94 Water: N/A
Concrete: N/A % Air Content: N/A
lA 7 7/5/05
3000/28
1 B 14 7/12/05
1C 28 7/26/05
3000/28
3000/28
1 D 28 7/26/05
Curing ASTM C-31
~ASTM C-143
Remarks:
Test Method
ASTM C-39 & 231
Cylinder Made By:
SE&T
3000/28
Cylinders Tested By:
Very Truly Yours,
Sadik (SAM)AI-Musawe, MSc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent.
This repod only applies to the samples tested and does not necessarily represent identical or similar samples.
G:120051286txik51CpistrlCpistr18LL