Loading...
WA0101-LR050628Construction Materials Testing and Environmental Consulting Tex s CMT, Inc 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 2 (205-0147) Method: ASTM D2922 D3017 D698 Pa~ ~ t of 1 Client: Fox Contractors Malerial Description Mmximum Optimum D~, Moisture Density Conten~ Project: Hwy. 121 Water Line (Lhs/CuFt) Percent Test Date: June 22, 2005 1. Orange and Light Brown Silty Sand 117.9 10.S 2. Brown Silty Clay with Gravel ! 11.6 15.3 3. Brown Sandy Clay with Gravel 112.2 13.1 Report Date: June 28, 2005 4. Brown Sandy Clay 111.0 14.5 Required Density (%): 95% -100% Required Moisture (%): 0 to +5% omc Mat Location/Elevation (and/or) Lift In-Place In-Place Pereenl Test No. D~ Density Moisture Compaction No. (Lbs/CuF) Coment (%) 4 Retest of Test Location #41 7 6" 108.2 18.3 .4 4 Retest of Test Location #42 ] 8 6" 107.4 15.7~ 96.7 4 Retest of Test Location #43 9 6" I06.1 16.3 t 95.5 4 Retest of Test Location ~A6 l0 106.7 16.5 96.1 6" ~ 4 Retest of Test Location #48 11 106.2 14.6 . Test results meet project specifications cc: Ms. Suzan C Taylor-City of Coppe[I Mr Lan3* Davis - City of Coppell Mr Luis Velasquez - Fox Contractors, Inc. Mr. Douglas K. Showers - Birkhoff, Hendricks & Conway, LLP